Quick answers
What is this project?
132KV D/C Chandil Rajkharsawan Lilo at Kandra Transmission Line is a proposed power project in Ghutubera, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 16.1 acres.
Who is building it?
The applicant is Jusnl Jamshedpur.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Ghutubera, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹2.3 crore; a site of 16.1 acres and 9.8 acres (3.9 ha) of forest land.
When was it filed?
The application was filed on 16 Feb 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 24 Aug 2026 |
| Application filed | 16 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Jusnl Jamshedpur |
| Land area | 16.1 acres (6.5 ha) |
| Forest land | 9.8 acres (3.9 ha) |
| Project cost | ₹2.3 crore |
| Village / locality | Ghutubera |
| Taluk / tehsil | Adityapur(Gamharia) |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02305 |
In context
8 applications in Saraikela-Kharsawan since January 2022 are in the same category (Power): 0 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghutubera, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of an Integrated Mini Steel Plant by Increasing the Production of… — lapsed, 1.5 km away
- Change in the raw material mix by replacement of Domestic Scrap with Imported… — initial checks, 1.5 km away
- Change in the Raw Material Mix by Inclusion of Ld Sludge for Production of 1.2… — initial checks, 2 km away
- Amendment in Existing 1.2 MTPA Pellet Plant with Installation of PGP (Producer… — environmental approval granted, 2 km away
- Diversion of Forest Land for Laying of 11 KV Underground Power Cables Along/… — under forest review, 3.4 km away
- Proposed expansion of existing steel plant to Integrated Steel Plant through… — under environmental review, 3.7 km away
- Proposed expansion of existing steel plant to Integrated Steel Plant through… — cleared for impact study, 3.7 km away
- Proposed expansion of existing sponge iron plant through installation of 2 X… — lapsed, 3.7 km away
More from Jusnl Jamshedpur in Saraikela-Kharsawan
- 220 Kv D/C Chandil to Chandil Transmission Line — initial checks
- 132 KV DC Chouka Tamar Transmission Line — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.