EIA for setting up of 1.2 MTPA greenfield Integrated Steel Plant at Saraikela Kharsawan, Jharkhand is a proposed industrial project in Ketunga, Nimdih, Saraikela-Kharsawan, Jharkhand. The site covers 1,329.6 acres.
Who is building it?
The applicant is S M Steels and Powver Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 Apr 2026), as of 27 Nov 2026.
Where is it?
In Ketunga, Nimdih, Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹6,990 crore and a site of 1,329.6 acres.
When was it filed?
The application was filed on 27 Jun 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 Apr 2026 |
| Application filed | 27 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | S M Steels and Powver Limited |
| Land area | 1,329.6 acres (538.1 ha) |
| Project cost | ₹6,990 crore |
| Village / locality | Ketunga |
| Taluk / tehsil | Nimdih |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-01463 |
In context
47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,329.6 acres, this one is larger than 89% of them.
Where it is
Ketunga, Nimdih, Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- EIA for setting up of 1.2 MTPA greenfield Integrated Steel Plant at Saraikela… — environmental approval granted, 0 m away
- Soro (Jorgodih) Sand Ghat — environmental approval granted, 10.9 km away
- Soro (Jorgodih) Sand Ghat — withdrawn, 10.9 km away
- 132 KV DC Chouka Tamar Transmission Line — more information requested, 22.2 km away
- Proposed Integrated steel plant with Captive Power Plant (50 MW) by Narsingh… — environmental approval granted, 29.9 km away
- Expansion of existing steel plant by enhancement of Pig iron production from… — environmental approval granted, 29.9 km away
- Expansion of existing steel plant by enhancement of Pig iron production from… — cleared for impact study, 29.9 km away
- Transfer of Environment Clearance "Expansion of Integrated Steel Plant Project — lapsed, 33.2 km away
More from S M Steels and Powver Limited in Saraikela-Kharsawan
- EIA for setting up of 1.2 MTPA greenfield Integrated Steel Plant at Saraikela… — environmental approval granted
All 9 S M Steels and Powver projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.