Quick answers
What is this project?
EIA for setting up of 1.2 MTPA greenfield Integrated Steel Plant at Saraikela Kharsawan, Jharkhand is an approved industrial project in Sangira, Nimdih, Saraikela-Kharsawan, Jharkhand. The site covers 1,329.6 acres.
Who is building it?
The applicant is S M Steels and Powver Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Jun 2026), as of 27 Nov 2026.
Where is it?
In Sangira, Nimdih, Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹6,990 crore and a site of 1,329.6 acres.
When was it filed?
The application was filed on 1 Feb 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Jun 2026 |
| Application filed | 1 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | S M Steels and Powver Limited |
| Land area | 1,329.6 acres (538.1 ha) |
| Project cost | ₹6,990 crore |
| Village / locality | Sangira |
| Taluk / tehsil | Nimdih |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02152 |
In context
47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,329.6 acres, this one is larger than 89% of them.
Where it is
Sangira, Nimdih, Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- EIA for setting up of 1.2 MTPA greenfield Integrated Steel Plant at Saraikela… — cleared for impact study, 0 m away
- Soro (Jorgodih) Sand Ghat — environmental approval granted, 10.9 km away
- Soro (Jorgodih) Sand Ghat — withdrawn, 10.9 km away
- 132 KV DC Chouka Tamar Transmission Line — more information requested, 22.2 km away
- Proposed Integrated steel plant with Captive Power Plant (50 MW) by Narsingh… — environmental approval granted, 29.9 km away
- Expansion of existing steel plant by enhancement of Pig iron production from… — environmental approval granted, 29.9 km away
- Expansion of existing steel plant by enhancement of Pig iron production from… — cleared for impact study, 29.9 km away
- Transfer of Environment Clearance "Expansion of Integrated Steel Plant Project — lapsed, 33.2 km away
More from S M Steels and Powver Limited in Saraikela-Kharsawan
- EIA for setting up of 1.2 MTPA greenfield Integrated Steel Plant at Saraikela… — cleared for impact study
All 9 S M Steels and Powver projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.