Quick answers
What is this project?
Initimation regarding change in Type of Boiler from AFBC to CFBC under "No Increase in Pollution Load" as per para 7(ii) (c) of EIA Notification 2006 by M/s Sundaram Steels Private Limited located at B-7, Phase-III, Bokaro Industrial Area, Balidih, Bokaro, Jharkhand is a proposed industrial project in Bokaro Steel City, Chas, Bokaro, Jharkhand. The site covers 25 acres.
Who is building it?
The applicant is Sundaram Steels Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Bokaro Steel City, Chas, Bokaro, Jharkhand.
How big is it?
It has a stated cost of ₹221.7 crore and a site of 25 acres.
When was it filed?
The application was filed on 29 Aug 2025.
Project details
| Status | Initial checks |
|---|---|
| Status since | 29 Aug 2025 |
| Application filed | 29 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Sundaram Steels Private Limited |
| Land area | 25 acres (10.1 ha) |
| Project cost | ₹221.7 crore |
| Village / locality | Bokaro Steel City |
| Taluk / tehsil | Chas |
| District | Bokaro |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-01704 |
In context
27 applications in Bokaro since January 2022 are in the same category (Industry): 16 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 25 acres, this one is larger than 70% of them.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bokaro Steel City, Chas, Bokaro, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing Sponge Iron plant from 54,000 TPA to 174,000 TPA,… — environmental approval granted, 0 m away
- Expansion of Existing plant for total production of 0.6864 MTPA Sponge Iron,… — withdrawn, 100 m away
- Expansion of Existing plant for total production of 0.6864 MTPA Sponge Iron,… — cleared for impact study, 100 m away
- ENVIRONMENTAL CLEARANCE TO ENHANCE THE PRODUCTION OF M.S INGOT/BILLET FROM… — lapsed, 350 m away
- Industrial project by Bokaro Spirits & Allied Industries Private Limited — environmental approval granted, 550 m away
- Transfer of Environment Clearance and its Corrigendum in EC from Castron… — lapsed, 1 km away
- Greenfield Ferro Alloys Plant for production of 40,000 TPA (Max.) Ferro Alloys… — cleared for impact study, 1.1 km away
- Greenfield Ferro Alloys Plant for production of 31,000 TPA (max.) Ferro Alloys… — environmental approval granted, 1.3 km away
More from Sundaram Steels Private Limited in Bokaro
- Expansion of Existing plant for total production of 0.6864 MTPA Sponge Iron,… — cleared for impact study
- Expansion of Existing plant for total production of 0.6864 MTPA Sponge Iron,… — withdrawn
- Expansion of existing Sponge Iron plant from 54,000 TPA to 174,000 TPA,… — environmental approval granted
All 4 Sundaram Steels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.