Expansion of Existing plant for total production of 0.6864 MTPA Sponge Iron, 0.462 MTPA MS Billets/ slabs production, 0.396 MTPA MS rolled Products, Installation of Ferro Alloys plant for production of 0.102 MTPA (max.) Ferro Alloys and 0.071 MTPA MC Ferro Alloys, Installation of 0.9 MTPA Pellet Plant is a withdrawn industrial project in Bokaro Steel City, Chas, Bokaro, Jharkhand. The site covers 57 acres.
Who is building it?
The applicant is Sundaram Steels Private Limited.
Has it been approved?
No. The application was withdrawn on 6 May 2026, so it is no longer under consideration.
Where is it?
In Bokaro Steel City, Chas, Bokaro, Jharkhand.
How big is it?
It has a stated cost of ₹1,021.7 crore and a site of 57 acres.
When was it filed?
The application was filed on 6 May 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Existing plant for total production of 0.6864 MTPA Sponge Iron, 0.462 MTPA…
Project details
| Official title | Expansion of Existing plant for total production of 0.6864 MTPA Sponge Iron, 0.462 MTPA MS Billets/ slabs production, 0.396 MTPA MS rolled Products, Installation of Ferro Alloys plant for production of 0.102 MTPA (max.) Ferro Alloys and 0.071 MTPA MC Ferro Alloys, Installation of 0.9 MTPA Pellet Plant along with 88 MW Captive Power Plant along with allied facilities by M/s Sundaram Steels Private Limited at B-7, Phase-III, B-8(P) & B-8(P)2, Bokaro Industrial Area, Balidih, Bokaro, Jharkhand |
|---|---|
| Status | Withdrawn |
| Status since | 6 May 2026 |
| Application filed | 6 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Sundaram Steels Private Limited |
| Land area | 57 acres (23.1 ha) |
| Project cost | ₹1,021.7 crore |
| Village / locality | Bokaro Steel City |
| Taluk / tehsil | Chas |
| District | Bokaro |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02113 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 26 May 2026 | Cleared for impact study | 57 acres | ₹1,021.7 crore |
| Early planning filed 6 May 2026 (this page) | Withdrawn | 57 acres | ₹1,021.7 crore |
In context
27 applications in Bokaro since January 2022 are in the same category (Industry): 16 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 57 acres, this one is larger than 81% of them.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bokaro Steel City, Chas, Bokaro, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing plant for total production of 0.6864 MTPA Sponge Iron,… — cleared for impact study, 0 m away
- Initimation regarding change in Type of Boiler from AFBC to CFBC under "No… — initial checks, 100 m away
- Expansion of existing Sponge Iron plant from 54,000 TPA to 174,000 TPA,… — environmental approval granted, 100 m away
- ENVIRONMENTAL CLEARANCE TO ENHANCE THE PRODUCTION OF M.S INGOT/BILLET FROM… — lapsed, 450 m away
- Industrial project by Bokaro Spirits & Allied Industries Private Limited — environmental approval granted, 550 m away
- Transfer of Environment Clearance and its Corrigendum in EC from Castron… — lapsed, 1.1 km away
- Greenfield Ferro Alloys Plant for production of 40,000 TPA (Max.) Ferro Alloys… — cleared for impact study, 1.2 km away
- Greenfield Ferro Alloys Plant for production of 31,000 TPA (max.) Ferro Alloys… — environmental approval granted, 1.3 km away
More from Sundaram Steels Private Limited in Bokaro
- Initimation regarding change in Type of Boiler from AFBC to CFBC under "No… — initial checks
- Expansion of existing Sponge Iron plant from 54,000 TPA to 174,000 TPA,… — environmental approval granted
All 4 Sundaram Steels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.