What is Developing? Open the mapMap

Under environmental reviewIndustry · Giridih, Jharkhand

Expansion of existing Sponge Iron Plant from 33,000TPA to 264,000TPA through existing 1x100TPD DRI Kiln and additional 1x600TPD & 1x100TPD DRI Kilns, Production of 198,000TPA Billets by installing 3x20T Induction Furnaces

Expansion of existing Sponge Iron Plant from 33,000TPA to 264,000TPA through existing 1x100TPD DRI Kiln and additional 1x600TPD & 1x100TPD DRI Kilns, Production of 198,000TPA Billets by installing 3x20T Induction Furnaces is a proposed industrial project in Chatro, Giridih, Jharkhand. The site covers 34.6 acres. Its stated project cost is ₹424.9 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 20 Nov 2026).

See it on the live map All projects in Giridih

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of existing Sponge Iron Plant from 33,000TPA to 264,000TPA through existing…

Project details

Official titleExpansion of existing Sponge Iron Plant from 33,000TPA to 264,000TPA through existing 1x100TPD DRI Kiln and additional 1x600TPD & 1x100TPD DRI Kilns, Production of 198,000TPA Billets by installing 3x20T Induction Furnaces along with 2 strand 6/11m CCM, Production of 165,000TPA Rolled Products by installing 500TPD Rolling Mill along with 25TPH Reheating Furnace and installation of Captive Power Plant of 25 MW (16MW WHRB and 9MW AFBC) capacity at Mauza - Chatro, P.S, Dis. Giridih Jharkhand.
StatusUnder environmental review
Status since20 Nov 2026
Application filed26 Jun 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantMongia Power Private Limited
Land area34.6 acres (14 ha)
Project cost₹424.9 crore
Village / localityChatro
Taluk / tehsilGiridih
DistrictGiridih
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-01963

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 26 Jun 2026 (this page)Under environmental review34.6 acres₹424.9 crore
Early planning filed 23 Apr 2024Cleared for impact study34.6 acres₹424.9 crore

In context

29 applications in Giridih since January 2022 are in the same category (Industry): 20 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 34.6 acres, this one is larger than 62% of them.

28 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chatro, Giridih, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.