Project details
| Official title | Enhancement of Sponge Iron Production from 90,000 TPA to 99,000 TPA (by increasing number of operating days of the existing 3x100 TPD DRI Kilns) along with Installation of 12.5 MW Captive Power Plant (WHRB – 6 MW & AFBC – 6.5 MW) with the existing 3x100 TPD DRI Plant by M/s Balmukund Sponge and Iron Pvt. Ltd. (Sponge Division) At Mauza:- Manjhiladih, P.O. Gadi Srirampur, P.S. Giridih, Dist. Giridih, Jharkhand |
|---|---|
| Status | Environmental approval granted |
| Status since | 1 Mar 2025 |
| Application filed | 6 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | M/S Balmukund Sponge & Iron PVT. LTD. (Sponge Division) |
| Land area | 8.8 acres (3.6 ha) |
| Project cost | ₹87.8 crore |
| Village / locality | Majhiladh |
| Taluk / tehsil | Giridih |
| District | Giridih |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00791 |
In context
29 applications in Giridih since January 2022 are in the same category (Industry): 20 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 8.8 acres, this one is smaller than 90% of them.
29 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Majhiladh, Giridih, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Expansion of Sponge Iron Plant from 33,000 TPA to… — environmental approval granted, 450 m away
- Environmental Clearance for Expansion of Sponge Iron Plant from 33,000 TPA to… — cleared for impact study, 450 m away
- Expansion of Sponge Iron Plant of M/s Atibir Industries Co. Ltd. by addition… — environmental approval granted, 500 m away
- Expansion of existing Rolling Mill form Production Capacity of TMT Bars –… — cleared for impact study, 550 m away
- Expansion of existing Sponge Iron Plant from 33,000TPA to 264,000TPA through… — under environmental review, 700 m away
- Expansion of existing Sponge Iron Plant from 33,000TPA to 264,000TPA through… — cleared for impact study, 700 m away
- Expansion of Sponge iron plant production from 33,000TPA to 62700 TPA by… — environmental approval granted, 1.2 km away
- Expansion of Sponge iron plant production from 33,000TPA to 62700 TPA by… — cleared for impact study, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.