Project details
| Official title | Environmental Clearance for Expansion of Sponge Iron Plant from 33,000 TPA to 62,700 TPA by addition of 90 TPD Kiln & existing 100 TPD Kiln along with proposed Captive Power Plant 8MW(2X2MW WHRB & 1X4MW AFBC), M.S. Billets production 1,40,000 TPA by installing 2x20Ton Induction Furnace with CCM (3X6/11), Re Rolling Mill for production of 1,40,000 TPA rolled products and Slag Crusher Unit (10 TPH) by M/s. Venkateswara Sponge & Iron Company Private Limited at Village- Mahuatand, District- Giridih |
|---|---|
| Status | Environmental approval granted |
| Status since | 23 Jan 2025 |
| Application filed | 12 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Venkateshwara Sponge and Iron Company Private Limited |
| Land area | 27.5 acres (11.1 ha) |
| Project cost | ₹31.6 crore |
| Village / locality | Mahuatanr |
| Taluk / tehsil | Giridih |
| District | Giridih |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00588 |
In context
29 applications in Giridih since January 2022 are in the same category (Industry): 20 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 27.5 acres, this one is larger than 52% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahuatanr, Giridih, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Expansion of Sponge Iron Plant from 33,000 TPA to… — cleared for impact study, 0 m away
- Expansion of Sponge Iron Plant of M/s Atibir Industries Co. Ltd. by addition… — environmental approval granted, 300 m away
- Enhancement of Sponge Iron Production from 90,000 TPA to 99,000 TPA (by… — environmental approval granted, 450 m away
- Expansion of existing Rolling Mill form Production Capacity of TMT Bars –… — cleared for impact study, 550 m away
- Expansion of Sponge iron plant production from 33,000TPA to 62700 TPA by… — environmental approval granted, 850 m away
- Expansion of Sponge iron plant production from 33,000TPA to 62700 TPA by… — cleared for impact study, 850 m away
- Expansion of existing Sponge Iron Plant from 33,000TPA to 264,000TPA through… — under environmental review, 1.1 km away
- Expansion of existing Sponge Iron Plant from 33,000TPA to 264,000TPA through… — cleared for impact study, 1.1 km away
More from Venkateshwara Sponge and Iron Company Private Limited in Giridih
- Environmental Clearance for Expansion of Sponge Iron Plant from 33,000 TPA to… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.