Quick answers
What is Bhadudih Stone Deposit (0.708 Ha)?
Bhadudih Stone Deposit (0.708 Ha) is an approved mining project in Bhadudih, Chandil, Saraikela-Kharsawan, Jharkhand. The site covers 1.8 acres.
Who is building it?
The applicant is Devraj Mahato.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Aug 2026), as of 27 Nov 2026.
Where is it?
In Bhadudih, Chandil, Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹46 lakh and a site of 1.8 acres.
When was it filed?
The application was filed on 30 Jun 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Aug 2026 |
| Application filed | 30 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Devraj Mahato |
| Land area | 1.8 acres (0.7 ha) |
| Project cost | ₹46 lakh |
| Village / locality | Bhadudih |
| Taluk / tehsil | Chandil |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-01982 |
In context
44 applications in Saraikela-Kharsawan since January 2022 are in the same category (Mining): 33 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.8 acres, this one is smaller than 91% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bhadudih, Chandil, Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of existing steel plant to Integrated Steel Plant through… — under environmental review, 3.7 km away
- Proposed expansion of existing steel plant to Integrated Steel Plant through… — cleared for impact study, 3.7 km away
- Proposed expansion of existing sponge iron plant through installation of 2 X… — lapsed, 3.7 km away
- Amendment in Existing 1.2 MTPA Pellet Plant with Installation of PGP (Producer… — environmental approval granted, 5.3 km away
- Change in the Raw Material Mix by Inclusion of Ld Sludge for Production of 1.2… — initial checks, 5.4 km away
- Change in the raw material mix by replacement of Domestic Scrap with Imported… — initial checks, 5.8 km away
- Expansion of an Integrated Mini Steel Plant by Increasing the Production of… — lapsed, 5.8 km away
- 220 Kv D/C Chandil to Chandil Transmission Line — initial checks, 5.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.