Quick answers
What is this project?
Proposed Standalone Clinker Grinding Unit with Cement Production Capacity of 6.0 Million TPA (2 x 3 Million TPA) by M/s. Ambuja Concrete North Private Limited is a proposed industrial project in Nagrota, Kathua, Jammu and Kashmir. The site covers 140.4 acres.
Who is building it?
The applicant is Ambuja Concrete North Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 22 Mar 2025), as of 27 Nov 2026.
Where is it?
In Nagrota, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹2,246 crore and a site of 140.4 acres.
When was it filed?
The application was filed on 23 Jan 2025.
Project details
| Official title | Proposed Standalone Clinker Grinding Unit with Cement Production Capacity of 6.0 Million TPA (2 x 3 Million TPA) At Village: Merth and Nagrota, Tehsil & District: Kathua (Jammu & Kashmir) by M/s. Ambuja Concrete North Private Limited |
|---|---|
| Status | Cleared for impact study |
| Status since | 22 Mar 2025 |
| Application filed | 23 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Ambuja Concrete North Private Limited |
| Land area | 140.4 acres (56.8 ha) |
| Project cost | ₹2,246 crore |
| Village / locality | Nagrota |
| Taluk / tehsil | Kathua |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00278 |
In context
12 applications in Kathua since January 2022 are in the same category (Industry): 5 approved, 0 filed or under review, and 7 withdrawn, lapsed or rejected. At 140.4 acres, this one is larger than 92% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nagrota, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s Kargil steel and Power Ltd. — not approved, 3.4 km away
- WSS Bakhta — lapsed, 5 km away
- Retrofitting of Water Supply scheme Baktha under Jal Jeevan Mission — decision issued, 5 km away
- Retrofitting of Water Supply scheme Baktha under Jal Jeevan Mission — forest land use approved, 5 km away
- Retrofitting of WSS Forelain East (Ghatti Badanal) — lapsed, 6.7 km away
- WSS Forelain East Ghatti Badanal — forest land use approved, 6.7 km away
- Manufacturing of BOPET Films & PET Chips by M/s Aegios polyfilms private Limited — environmental approval granted, 7.2 km away
- Standalone Grinding Unit with Cement Production Capacity of 2.0 Million TPA… — cleared for impact study, 7.3 km away
All 19 Ambuja Concrete North projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.