Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Sept 2026 |
| Application filed | 24 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Aurocils Beverages Private Limited |
| Land area | 500 m² |
| Project cost | ₹1.5 crore |
| Village / locality | Nanga |
| Taluk / tehsil | Samba |
| District | Samba |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00406 |
In context
26 applications in Samba since January 2022 are in the same category (Industry): 12 approved, 2 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.1 acres, this one is smaller than 100% of them.
Where it is
Nanga, Samba, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Bed Material Project at Block No. 1/12 — lapsed, 8.1 km away
- River Bed Material Project at Block No. 1/12, (Area 9.11 ha.), Devak River… — lapsed, 8.1 km away
- (River Bed Material) Mining Project, Block No. 1/11, Village- Thalori Brahmna,… — environmental approval granted, 8.4 km away
- River Bed mining Project at Block no 2/6 Basantar River Downstream NH 1A… — environmental approval granted, 9.1 km away
- Minor Mineral (River Bed Material) Mining Project, Block-2/5, (Effective… — lapsed, 9.3 km away
- MINING PROJECT MINOR MINERAL (River Bed Material) Project at Block No.2/5,… — environmental approval granted, 9.3 km away
- River Bed Mining Project at Block no 2/4 Basantar River ,Downstream NH-1A… — environmental approval granted, 11.4 km away
- Gurdaspur-Jammu Natural Gas Pipeline — lapsed, 12 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.