Quick answers
What is 4G Saturation Project Siaru (Baggan)?
4G Saturation Project Siaru (Baggan) is an approved telecom project in Baggan, Billawar, Kathua, Jammu and Kashmir. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 15 Apr 2026), as of 27 Nov 2026.
Where is it?
In Baggan, Billawar, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹24 lakh; a site of 0 acres and 230 m² of forest land.
When was it filed?
The application was filed on 1 Sept 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 15 Apr 2026 |
| Application filed | 1 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 230 m² |
| Project cost | ₹24 lakh |
| Village / locality | Baggan |
| Taluk / tehsil | Billawar |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00415 |
In context
25 applications in Kathua since January 2022 are in the same category (Telecom): 18 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baggan, Billawar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- L034-(link road) BB Sukrala Morian Road RD 8.600 to Salli, Pkg No:-JK07-4506 — more information requested, 2.4 km away
- Water Supply Scheme Thamnal Baggan — forest land use approved, 3 km away
- Minor Mineral Block No. 04 in Naj Nallah Upstream Naj Bridge, District Kathua… — environmental approval granted, 3.7 km away
- Design, Supply, Installation and Commissioning of National Flag Mast at… — lapsed, 4 km away
- Tourist Reception Centre and Design and Supply Installation & Commissioning of… — lapsed, 4 km away
- Tourist Reception Centre and Design and Supply Installation & Commissioning of… — lapsed, 4 km away
- Water Supply Scheme Najote — forest land use approved, 4 km away
- RBM (River Bed Mineral) Mining Project, Block No.:- 06, Revised Area: 8.94 ha.… — environmental approval granted, 4.1 km away
More from Mahesh Nair in Kathua
- 4G Saturation Project at Village Domar — more information requested
- 4G Saturation Project Malman (Forlain) — forest land use approved
- 4G Saturation Project Biyan — forest land use approved
- 4G Saturation Project Malad — forest land use approved
- 4G Saturation Project Hadat — forest land use approved
- 4G Saturation Project Plakh — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.