Quick answers
What is Water Supply Scheme Thamnal Baggan?
Water Supply Scheme Thamnal Baggan is an approved water and irrigation project in Baggan, Billawar, Kathua, Jammu and Kashmir. The site covers 0.6 acres.
Who is building it?
The applicant is Chief Engineer Jal Shakti Vibhag.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 16 Apr 2026), as of 27 Nov 2026.
Where is it?
In Baggan, Billawar, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹7.8 crore; a site of 0.6 acres and 570 m² of forest land.
When was it filed?
The application was filed on 30 May 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 30 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Chief Engineer Jal Shakti Vibhag |
| Land area | 2,500 m² |
| Forest land | 570 m² |
| Project cost | ₹7.8 crore |
| Village / locality | Baggan |
| Taluk / tehsil | Billawar |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02917 |
In context
125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 0.6 acres, this one is smaller than 74% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baggan, Billawar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Water Supply Scheme Kattli Baggan — forest land use approved, 2.4 km away
- 4G Saturation Project Delew (Baggan) — forest land use approved, 3 km away
- 4G Saturation Project Siaru (Baggan) — forest land use approved, 3 km away
- 4G Saturation Project Phyat. Gutra (Dhardugnoo) — forest land use approved, 4 km away
- L034-(link road) BB Sukrala Morian Road RD 8.600 to Salli, Pkg No:-JK07-4506 — more information requested, 4.2 km away
- RBM (River Bed Mineral) Mining Project, Block No.:- 06, Revised Area: 8.94 ha.… — environmental approval granted, 4.6 km away
- Water Supply Scheme Dehota — more information requested, 5.3 km away
- Design, Supply, Installation and Commissioning of National Flag Mast at… — lapsed, 5.5 km away
More from Chief Engineer Jal Shakti Vibhag in Kathua
- Water Supply Scheme Siada — lapsed
- Water Supply Scheme Athialta Part-2 — lapsed
- Water Supply Scheme Dinga Amb — lapsed
- Water Supply Scheme Dhalta — lapsed
- Water Supply Scheme Randood — lapsed
- Water Supply Scheme Sandhar Dodla — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.