Project details
| Status | Forest land use approved |
|---|---|
| Status since | 19 Jul 2024 |
| Application filed | 15 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹24 lakh |
| Village / locality | Saras |
| Taluk / tehsil | Doda |
| District | Doda |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02452 |
In context
23 applications in Doda since January 2022 are in the same category (Telecom): 12 approved, 9 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Saras, Doda, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Road from Doli Mandir to Kotri Riae via Rewara — forest land use approved, 1.5 km away
- Retrofitting of WSS Khellani — forest land use approved, 2.8 km away
- Retrofitting of WSS Khellani — lapsed, 2.8 km away
- Balance portion of 132 KV D/C Ramban-Khellani, 132 KV Khellani-Kishtwar and… — forest land use approved, 2.9 km away
- Construction and Maintenance of L028-(Link Road) KM 4th RD400 Gangalwar to… — more information requested, 3.1 km away
- Water Supply Scheme Trown Shaya Rahi — forest land use approved, 3.1 km away
- 4G Saturation Project Saras — forest land use approved, 3.3 km away
- 4G Saturation Project Chattergalla — forest land use approved, 3.5 km away
More from Mahesh Nair in Doda
- 4G Saturation Project at Village Seoj Dhar — initial checks
- 4G Saturation Project at Village Jai Ghatti Ganthak and Bash Dhar — initial checks
- 4G Saturation Project at Village Hanga, Noori Thambli — initial checks
- 4G Saturation Project at Village Forest Block Suhanda (Shiva) — initial checks
- 4G Saturation Project at Village Seri, Neota Drudu — initial checks
- 4G Saturation Project at Village Tantna (Lodna) — more information requested