Project details
| Status | Forest land use approved |
|---|---|
| Status since | 17 Apr 2026 |
| Application filed | 2 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹24 lakh |
| Village / locality | Saras |
| Taluk / tehsil | Doda |
| District | Doda |
| State | Jammu and Kashmir |
| Location from | Site area on record |
| Our reference | WID-JK-03026 |
In context
23 applications in Doda since January 2022 are in the same category (Telecom): 12 approved, 9 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Saras, Doda, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Retrofitting of WSS Khellani — forest land use approved, 950 m away
- Retrofitting of WSS Khellani — lapsed, 950 m away
- Water Supply Scheme Saras — lapsed, 1.4 km away
- Water Supply Scheme Saras — lapsed, 1.4 km away
- 4G Saturation Project Satwas & Shaya — forest land use approved, 3.3 km away
- Water Supply Scheme Ganika Malwas — lapsed, 3.4 km away
- Water Supply Scheme Sharoa Sundhara — forest land use approved, 3.5 km away
- Link Road from Bhagwah Road to Baryal, Sisniyal & Zazan at Panchayat Malwas… — forest land use approved, 3.5 km away
More from Mahesh Nair in Doda
- 4G Saturation Project at Village Seoj Dhar — initial checks
- 4G Saturation Project at Village Jai Ghatti Ganthak and Bash Dhar — initial checks
- 4G Saturation Project at Village Hanga, Noori Thambli — initial checks
- 4G Saturation Project at Village Forest Block Suhanda (Shiva) — initial checks
- 4G Saturation Project at Village Seri, Neota Drudu — initial checks
- 4G Saturation Project at Village Tantna (Lodna) — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.