Project details
| Status | Lapsed |
|---|---|
| Status since | 21 Oct 2025 |
| Application filed | 19 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | JSW Renewable Energy (Vijayanagar) Limited |
| Land area | 59.1 acres (23.9 ha) |
| Project cost | ₹9.9 crore |
| Village / locality | Kurekuppa |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00537 |
In context
7 applications in Ballari since January 2022 are in the same category (Water & irrigation): 2 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kurekuppa, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sanction of work "Torangallu to Ranjithpura Doubling (23km of South Western… — lapsed, 1.4 km away
- EC for Setting up of 25 MTPA capacity (mineral throughput) Green-field High… — environmental approval granted, 1.4 km away
- EC for Setting up of 25 MTPA capacity (mineral throughput) Green-field High… — cleared for impact study, 1.4 km away
- Expansion / Modernization of Existing Jindal Vijayanagar Airport located at… — cleared for impact study, 1.6 km away
- Split of existing EC of JSW Steel Ltd, Vijayanagar works of 18 MTPA Steel… — environmental approval granted, 2.7 km away
- Split of existing EC of JSW Steel Ltd, Vijayanagar works of 18 MTPA Steel… — withdrawn, 2.7 km away
- Split of existing EC of JSW Steel Ltd, Vijayanagar works of 18 MTPA Steel… — returned to applicant, 2.7 km away
- Environment Clearance for Change in Plant Configuration Without Increase in… — withdrawn, 2.9 km away
More from JSW Renewable Energy (Vijayanagar) Limited in Ballari
- 33kv Interconnecting Underground Transmission line for 600MW wind power project — forest land use approved
- 33kv Interconnecting Underground Transmission line for 600MW Wind Power Project — more information requested
- 33 KV Interconnecting Transmission line for 600 MW Wind Power Project — lapsed
4 Jsw Renewable Energy projects in Ballari
All 6 Jsw Renewable Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.