One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 0.893ha Forest Land and Re-Diversion of 0.627ha (Total 1.52ha) for…
Project details
| Status | Under forest review |
|---|---|
| Status since | 20 Dec 2025 |
| Application filed | 26 May 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Power |
| Applicant | Nmdc Limited Donimalai |
| Land area | 52.8 acres (21.4 ha) |
| Forest land | 2.1 acres (0.9 ha) |
| Project cost | ₹10 crore |
| Village / locality | Doni Malai |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-05938 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Sept 2025 | Under forest review | 52.8 acres | ₹10 crore |
| Change of use filed 26 May 2025 (this page) | Under forest review | 52.8 acres | ₹10 crore |
In context
9 applications in Ballari since January 2022 are in the same category (Power): 1 approved, 5 filed or under review, and 3 withdrawn, lapsed or rejected.
42 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Doni Malai, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.893ha Forest Land and Re-Diversion of 0.627ha (Total 1.52ha)… — under forest review, 0 m away
- Green field Screening cum Beneficiation Plant-II (10 MTPA capacity), Tailing… — environmental approval granted, 550 m away
- Green field Screening cum Beneficiation Plant-II (10 MTPA capacity), Tailing… — lapsed, 550 m away
- Diversion of 0.893ha Forest Land and Re-Diversion of 0.627ha (Total 1.52 Ha)… — lapsed, 800 m away
- Diversion of 0.893ha Forest Land and Re-Diversion of 0.627ha (Total 1.52 Ha)… — lapsed, 800 m away
- Proposed Residential Towers Project by NMDC Limited in existing Donimalai… — environmental approval granted, 1.4 km away
- Diversion of 0.956Ha forest land at Loading Plant Donimalai — lapsed, 2 km away
- Amendment to Environmental Clearance of Donimalai Iron Ore Mine of NMDC… — returned to applicant, 2.1 km away
More from Nmdc Limited Donimalai in Ballari
- Exploration at proposed Additional Area (281 Ha) adjacent to Donimalai Iron… — forest land use approved
- Diversion of 0.266Ha Forest Land for transportation of waste material from… — lapsed
- Diversion of 1.63ha Forest Land for Shifting of Existing Zilla Panchayat Road… — lapsed
- Diversion of 0.893ha Forest Land and Re-Diversion of 0.627ha (Total 1.52 Ha)… — lapsed
- Diversion of 1.58ha Forest Land Area for Shifting of Existing Zp Road Passing… — lapsed
- Renewal of 16.50ha already Diverted Forest Land For Ancillary Facilities… — lapsed
All 8 Nmdc Limited Donimalai projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.