What is Developing? Open the mapMap

LapsedWater & irrigation · Ballari, Karnataka

Diversion of 0.266Ha Forest Land for transportation of waste material from AD-3 dump of DIOM to Tailing Dam of proposed Screening Plant 2 at Donimalai NMDC Ltd

Diversion of 0.266Ha Forest Land for transportation of waste material from AD-3 dump of DIOM to Tailing Dam of proposed Screening Plant 2 at Donimalai NMDC Ltd is a lapsed water and irrigation project in Doni Malai, Sandur, Ballari, Karnataka. The site covers 1,974.2 acres. Its stated project cost is ₹120 crore. As of 27 Nov 2026, its status is “Lapsed” (since 13 Mar 2026).

See it on the live map All projects in Ballari

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since13 Mar 2026
Application filed23 Nov 2024
Approval soughtForest land use
Application typeNew project
SectorWater & irrigation
ApplicantNmdc Limited Donimalai
Land area1,974.2 acres (798.9 ha)
Forest land2,660 m²
Project cost₹120 crore
Village / localityDoni Malai
Taluk / tehsilSandur
DistrictBallari
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-06383

In context

7 applications in Ballari since January 2022 are in the same category (Water & irrigation): 2 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.

41 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Doni Malai, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Nmdc Limited Donimalai in Ballari

All 8 Nmdc Limited Donimalai projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.