One of 2 filings for this project. The project's main page, with every filing and where each stands: Green field Screening cum Beneficiation Plant-II (10 MTPA capacity), Tailing dam-1,…
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 11 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Nmdc Limited |
| Land area | 132.6 acres (53.7 ha) |
| Project cost | ₹957.5 crore |
| Village / locality | Doni Malai |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00317 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 15 Jul 2023 | Environmental approval granted | 132.6 acres | ₹957.5 crore |
| Early planning filed 11 Jul 2023 (this page) | Lapsed | 132.6 acres | ₹957.5 crore |
In context
213 applications in Ballari since January 2022 are in the same category (Mining): 78 approved, 56 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 132.6 acres, this one is larger than 53% of them.
No other mining lease on record is within 500 m of this site; 18 have applied within 5 km.
Where it is
Doni Malai, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Green field Screening cum Beneficiation Plant-II (10 MTPA capacity), Tailing… — environmental approval granted, 0 m away
- Diversion of 0.893ha Forest Land and Re-Diversion of 0.627ha (Total 1.52ha)… — under forest review, 550 m away
- Diversion of 0.893ha Forest Land and Re-Diversion of 0.627ha (Total 1.52ha)… — under forest review, 550 m away
- Diversion of 0.893ha Forest Land and Re-Diversion of 0.627ha (Total 1.52 Ha)… — lapsed, 1.2 km away
- Diversion of 0.893ha Forest Land and Re-Diversion of 0.627ha (Total 1.52 Ha)… — lapsed, 1.2 km away
- Amendment to Environmental Clearance of Donimalai Iron Ore Mine of NMDC… — returned to applicant, 1.6 km away
- Diversion of 0.266Ha Forest Land for transportation of waste material from… — lapsed, 1.8 km away
- Proposed Residential Towers Project by NMDC Limited in existing Donimalai… — environmental approval granted, 1.9 km away
More from Nmdc Limited in Ballari
- DIversion of forest land (7Ha) for dispatch routes of Kumaraswamy Iron Ore… — under forest review
- Re-diversion of 7.00 Hectare Forest land (3.33 Hectare inside SMIORE Mining… — initial checks
- Diversion of 4.68 Ha Forest Land for Existing Water Pipe Line From Water… — lapsed
- Exploration in additional area (un-diverted) of Kumaraswamy Iron Mine Lease… — lapsed
- Diversion of 0.956Ha forest land at Loading Plant Donimalai — lapsed
- Amendment to Environmental Clearance of Donimalai Iron Ore Mine of NMDC… — returned to applicant
9 Nmdc projects in Ballari
All 40 Nmdc projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.