Quick answers
What is Bsnl 4g Saturation Project at Konda?
Bsnl 4g Saturation Project at Konda is a lapsed telecom project in Usoda, Supa, Uttara Kannada, Karnataka. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 13 Aug 2025, so it is no longer under consideration.
Where is it?
In Usoda, Supa, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0 acres and 2.7 acres (1.1 ha) of forest land.
When was it filed?
The application was filed on 6 Sept 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Aug 2025 |
| Application filed | 6 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 2.7 acres (1.1 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Usoda |
| Taluk / tehsil | Supa |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06054 |
In context
529 applications in Uttara Kannada since January 2022 are in the same category (Telecom): 181 approved, 43 filed or under review, and 277 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0 acres, this one is smaller than 99% of them.
Where it is
Usoda, Supa, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Saturation Project — forest land use approved, 5.1 km away
- Bsnl 4g Saturation Project at Kesarodga — forest land use approved, 5.3 km away
- The Release of Forest Land for Burial Ground for Christian Community of… — initial checks, 8.7 km away
- Bsnl 4g Saturation Project at Kyatanagera — lapsed, 8.8 km away
- Bsnl 4g Saturation Project at Bapeli — forest land use approved, 8.8 km away
- Comprising of augmentation of pulp mill and existing paper machines,… — under wildlife review, 8.9 km away
- NBWL Clearance for the Exiting plant complex (Paper mill, printing and writing… — under wildlife review, 8.9 km away
- Forest clearance application for construction of Road — initial checks, 9.4 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.