Quick answers
What is this project?
Bsnl Usfo 4g Saturation Project at Nagoda - Ofc Route Is Proposed for Connectivity Along the Path Ways is a proposed telecom project in Joida, Supa, Uttara Kannada, Karnataka. It seeks 0.7 acres of forest land.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Joida, Supa, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹25 lakh and 2,730 m² of forest land.
When was it filed?
The application was filed on 10 Mar 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 5 Mar 2026 |
| Application filed | 10 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Forest land | 2,730 m² |
| Project cost | ₹25 lakh |
| Village / locality | Joida |
| Taluk / tehsil | Supa |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06389 |
In context
529 applications in Uttara Kannada since January 2022 are in the same category (Telecom): 181 approved, 43 filed or under review, and 277 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Joida, Supa, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl Usfo 4g Saturation Project at Nagoda - Ofc Route Is Proposed for… — lapsed, 0 m away
- Bsnl 4g Saturation Project at Nagoda — more information requested, 700 m away
- Bsnl Usfo 4g Saturation Project at Chapakand - Ofc Route Is Proposed for… — lapsed, 4.9 km away
- Bsnl 4g Saturation Project at Chapakhand — more information requested, 4.9 km away
- Bsnl 4g Saturation Project Ofc Route Kumbeli — decision issued, 5.7 km away
- Bsnl 4g Saturation Project Ofc Route Gangoda — lapsed, 5.9 km away
- Bsnl 4g Saturation Project Ofc Route Gangoda — decision issued, 5.9 km away
- Bsnl 4g Saturation Project Ofc Route Gangoda — lapsed, 5.9 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.