Quick answers
What is this project?
Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g Towers Under 4g Saturation Project With Extent of 0.5 M in Forest/Nonforest Area for Site is a lapsed telecom project in Hallyani, Bhatkal, Uttara Kannada, Karnataka. The site covers 0.1 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 23 Oct 2024, so it is no longer under consideration.
Where is it?
In Hallyani, Bhatkal, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹90 lakh; a site of 0.1 acres and 270 m² of forest land.
When was it filed?
The application was filed on 13 Jul 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g Towers…
Project details
| Official title | Proposal for Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g Towers Under 4g Saturation Project With Extent of 0.5 M in Forest/Nonforest Area for Site at Halyaani Village,bhatkal Taluk,uk Dist |
|---|---|
| Status | Lapsed |
| Status since | 23 Oct 2024 |
| Application filed | 13 Jul 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 300 m² |
| Forest land | 270 m² |
| Project cost | ₹90 lakh |
| Village / locality | Hallyani |
| Taluk / tehsil | Bhatkal |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06513 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 13 Jul 2024 (this page) | Lapsed | 0.1 acres | ₹90 lakh |
| New project filed 12 Apr 2024 | Forest land use approved | 0.1 acres | ₹90 lakh |
| New project filed 6 Apr 2024 | Decision issued | 0.1 acres | ₹90 lakh |
In context
529 applications in Uttara Kannada since January 2022 are in the same category (Telecom): 181 approved, 43 filed or under review, and 277 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.1 acres, this one is larger than 53% of them.
34 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hallyani, Bhatkal, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — forest land use approved, 0 m away
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — decision issued, 0 m away
- Bsnl 4g Saturation Project at Hallyani — under wildlife review, 150 m away
- Bsnl 4g Saturation Project at Hallyani — forest land use approved, 150 m away
- BSNL 4G Saturation Project Under USOF at HALLYANI — lapsed, 200 m away
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested, 1.2 km away
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — lapsed, 1.9 km away
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — forest land use approved, 1.9 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.