Quick answers
What is USO 4G mobile tower at Nagur?
USO 4G mobile tower at Nagur is an approved telecom project in Nagur, Kumta, Uttara Kannada, Karnataka. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 29 Aug 2025), as of 27 Nov 2026.
Where is it?
In Nagur, Kumta, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 15 Aug 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 29 Aug 2025 |
| Application filed | 15 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹50 lakh |
| Village / locality | Nagur |
| Taluk / tehsil | Kumta |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06629 |
In context
529 applications in Uttara Kannada since January 2022 are in the same category (Telecom): 181 approved, 43 filed or under review, and 277 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0 acres, this one is smaller than 99% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nagur, Kumta, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of forest land in Sy No.8 & 52A of Nagur Village, Mirjana Hobli,… — more information requested, 800 m away
- Diversion of forest land in Sy. No. 111 of Nagoor Village, Mirjan Hobli, Kumta… — lapsed, 1.9 km away
- USO 4G mobile tower at Brahmur — forest land use approved, 3.9 km away
- Bsnl 4g Saturation Project Brahmur With Ofc Route — lapsed, 3.9 km away
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — lapsed, 4.6 km away
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — lapsed, 4.6 km away
- USO 4G mobile tower at Kolimanjuguni — more information requested, 5.2 km away
- Renewal of 0.40 Ha of Forest land in Fsy No 64 of Mirjan Village, Kumta Taluk… — lapsed, 5.8 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.