Quick answers
What is this project?
Bsnlusof4gsaturationprojectat Hadgeri Village-Ofcroute Isproposedforconnectivity is a proposed telecom project in Hadgeri, Honavar, Uttara Kannada, Karnataka. The site covers 0.6 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Hadgeri, Honavar, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹95 lakh; a site of 0.6 acres and 1,400 m² of forest land.
When was it filed?
The application was filed on 3 May 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Bsnlusof4gsaturationprojectat Hadgeri Village-Ofcroute Isproposedforconnectivity
Project details
| Status | More information requested |
|---|---|
| Status since | 14 May 2026 |
| Application filed | 3 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 2,500 m² |
| Forest land | 1,400 m² |
| Project cost | ₹95 lakh |
| Village / locality | Hadgeri |
| Taluk / tehsil | Honavar |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06745 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 4 Jul 2024 | Lapsed | 0.6 acres | ₹95 lakh |
| New project filed 3 May 2024 (this page) | More information requested | 0.6 acres | ₹95 lakh |
| New project filed 10 Apr 2024 | Decision issued | 0.6 acres | ₹95 lakh |
In context
529 applications in Uttara Kannada since January 2022 are in the same category (Telecom): 181 approved, 43 filed or under review, and 277 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.6 acres, this one is larger than 76% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hadgeri, Honavar, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnlusof4gsaturationprojectat Hadgeri Village-Ofcroute Isproposedforconnectivity — lapsed, 0 m away
- Bsnlusof4gsaturationprojectat Hadgeri Village-Ofcroute Isproposedforconnectivity — decision issued, 0 m away
- USOF 4G Saturation project Honnavar Taluka — lapsed, 400 m away
- USOF 4G Saturation project Honnavar Taluka — lapsed, 400 m away
- USOF 4G Saturation project Honnavar Taluka — lapsed, 400 m away
- Bsnl 4g Saturation Project Hadgeri — under wildlife review, 2 km away
- Bsnl 4g Saturation Project Hadgeri — forest land use approved, 2 km away
- Bridge and Concrete Road Over a Stream on the Road Leading From Kuntodi to… — under forest review, 2.1 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.