Quick answers
What is Bsnl 4g Saturation Project Odc Route Chafer?
Bsnl 4g Saturation Project Odc Route Chafer is a lapsed telecom project in Chaper, Supa, Uttara Kannada, Karnataka. It seeks 0.7 acres of forest land.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 6 Jan 2025, so it is no longer under consideration.
Where is it?
In Chaper, Supa, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹50 lakh and 2,990 m² of forest land.
When was it filed?
The application was filed on 30 Jul 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Bsnl 4g Saturation Project Odc Route Chafer
Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Jan 2025 |
| Application filed | 30 Jul 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Forest land | 2,990 m² |
| Project cost | ₹50 lakh |
| Village / locality | Chaper |
| Taluk / tehsil | Supa |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-07036 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 30 Jul 2024 (this page) | Lapsed | ₹50 lakh | |
| New project filed 30 Jul 2024 | Decision issued | 0.7 acres | ₹50 lakh |
In context
529 applications in Uttara Kannada since January 2022 are in the same category (Telecom): 181 approved, 43 filed or under review, and 277 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chaper, Supa, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4 G Saturation Project Ofc Route Chafer — lapsed, 0 m away
- Bsnl 4g Saturation Project Odc Route Chafer — decision issued, 650 m away
- Bsnl 4g Saturation Project at Chafer — decision issued, 1.6 km away
- Bsnl 4g Saturation Project at Chafer — lapsed, 1.6 km away
- Bsnl 4 G Saturation Project Ofc Route Bidoli — more information requested, 3.3 km away
- Bsnl 4g Saturation Project Ofc Route Hebbal — decision issued, 3.7 km away
- Bsnl 4g Saturation Project Ofc Route Bidoli — lapsed, 3.9 km away
- Bsnl 4g Saturation Project Ofc Route Bidoli — decision issued, 3.9 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.