Quick answers
What is this project?
Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g Towers Under 4g Saturation Project With Extent of 0.5 M in Forest/Nonforest Area for Site is a lapsed telecom project in Devalamakki, Karwar, Uttara Kannada, Karnataka. The site covers 0.6 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 16 Jan 2025, so it is no longer under consideration.
Where is it?
In Devalamakki, Karwar, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0.6 acres and 1,580 m² of forest land.
When was it filed?
The application was filed on 14 Nov 2023.
Project details
| Official title | Proposal for Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g Towers Under 4g Saturation Project With Extent of 0.5 M in Forest/Nonforest Area for Site at Shirve Village,karwar Taluk,uk Dist |
|---|---|
| Status | Lapsed |
| Status since | 16 Jan 2025 |
| Application filed | 14 Nov 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 2,400 m² |
| Forest land | 1,580 m² |
| Project cost | ₹50 lakh |
| Village / locality | Devalamakki |
| Taluk / tehsil | Karwar |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-07073 |
In context
529 applications in Uttara Kannada since January 2022 are in the same category (Telecom): 181 approved, 43 filed or under review, and 277 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.6 acres, this one is larger than 76% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Devalamakki, Karwar, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Ofc Cable Under 4g Saturation Project for 4g Bts in Shirve,karwar… — forest land use approved, 200 m away
- Optical Fiber Cable Laying by Bharat Sanchar Nigam LTD for Connectivity to 4g… — lapsed, 200 m away
- BSNL 4 G SATURATION PROJECT AT NAITISAVAR under DCF Karwar — forest land use approved, 2.6 km away
- Optical Fiber Cable Laying Under 4g Satuaration Project for Naitisavar… — forest land use approved, 2.8 km away
- Optical Fiber Cable Laying by Bharat Sanchar Nigam LTD for Connectivity to 4g… — lapsed, 2.8 km away
- Optical Fiber Cable Laying by Bharat Sanchar Nigam LTD for Connectivity to 4g… — lapsed, 3 km away
- Underground OFC laying under USOF 4G saturation project in Karwar Division… — forest land use approved, 3 km away
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — lapsed, 3 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.