Quick answers
What is this project?
Optical Fiber Cable Laying by Bharat Sanchar Nigam LTD for Connectivity to 4g Towers Under 4g Saturation Project With Extent of 0.5m in Forest/Nonforest Area for Site at Heggarmakkigadde,ankola Taluk,uk Dist is a lapsed telecom project in Heggarmakigadde, Ankola, Uttara Kannada, Karnataka. The site covers 0.3 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 2 Sept 2024, so it is no longer under consideration.
Where is it?
In Heggarmakigadde, Ankola, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0.3 acres and 710 m² of forest land.
When was it filed?
The application was filed on 29 Apr 2024.
Project details
| Official title | Proposal for Optical Fiber Cable Laying by Bharat Sanchar Nigam LTD for Connectivity to 4g Towers Under 4g Saturation Project With Extent of 0.5m in Forest/Nonforest Area for Site at Heggarmakkigadde,ankola Taluk,uk Dist |
|---|---|
| Status | Lapsed |
| Status since | 2 Sept 2024 |
| Application filed | 29 Apr 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 1,400 m² |
| Forest land | 710 m² |
| Project cost | ₹50 lakh |
| Village / locality | Heggarmakigadde |
| Taluk / tehsil | Ankola |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-07529 |
In context
529 applications in Uttara Kannada since January 2022 are in the same category (Telecom): 181 approved, 43 filed or under review, and 277 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.3 acres, this one is larger than 63% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Heggarmakigadde, Ankola, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ofc Laying 0.5 M in Forest/Nonforest Area Optical Fiber Cable Laying by… — lapsed, 1.4 km away
- Vented Barrage Across Gangavali River at Honnalli to Supply Additional Water… — under forest review, 1.4 km away
- Land Use Change / Laying of Overhead Transmission Line specific to Survey No.… — under forest review, 1.9 km away
- 4g Saturation project of kavalalli Ankola Tq — lapsed, 1.9 km away
- Bsnl 4g Saturation Project Kavalalli — forest land use approved, 2.3 km away
- OPTICAL FIBER CABLE LAYING BY BHARATH SANCHAR NIGAM LTD FOR CONNECTIVITY TO 4G… — lapsed, 2.5 km away
- Phase-2, Providing 4g/5g Coverage to Uncovered Villages Under Karwar Dcf of… — lapsed, 2.8 km away
- 4g Saturation Project at Heggar Makkigadde Under Usfo — lapsed, 3.5 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.