Quick answers
What is 4G Saturation Project of mallane?
4G Saturation Project of mallane is a lapsed telecom project in Mallani, Ankola, Uttara Kannada, Karnataka. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Mallani, Ankola, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 9 Dec 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 9 Dec 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹50 lakh |
| Village / locality | Mallani |
| Taluk / tehsil | Ankola |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-07625 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Dec 2022 (this page) | Lapsed | 0 acres | ₹50 lakh |
| New project filed 9 Dec 2022 | Lapsed | 0.1 acres | ₹50 lakh |
In context
529 applications in Uttara Kannada since January 2022 are in the same category (Telecom): 181 approved, 43 filed or under review, and 277 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0 acres, this one is smaller than 99% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mallani, Ankola, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation Project of kendige — lapsed, 0 m away
- Bsnl 4g Saturation Project Kendige With Ofc Route — forest land use approved, 50 m away
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — lapsed, 3.1 km away
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — lapsed, 3.1 km away
- Providing 4g/5g Coverage to Uncovered Villages Under Karwar Dcf of Karwar Ssa… — lapsed, 3.6 km away
- Providing 4g/5g Coverage to Uncovered Villages Under Karwar Dcf of Karwar Ssa — lapsed, 3.6 km away
- Providing 4g/5g Coverage to Uncovered Villages Under Karwar Dcf of Karwar Ssa — lapsed, 3.6 km away
- Providing 4g/5g Coverage to Uncovered Villages Under Karwar Dcf of Karwar Ssa — lapsed, 3.6 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.