Quick answers
What is this project?
Underground OFC laying under USO 4G saturation project in Manchikeri Range ,Yellapur Division Area is a lapsed telecom project in Chikkoti, Yellapur, Uttara Kannada, Karnataka. The site covers 6.2 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 18 Aug 2025, so it is no longer under consideration.
Where is it?
In Chikkoti, Yellapur, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹50 lakh; a site of 6.2 acres and 6.2 acres (2.5 ha) of forest land.
When was it filed?
The application was filed on 1 Feb 2025.
Project details
| Official title | Proposal for Underground OFC laying under USO 4G saturation project in Manchikeri Range ,Yellapur Division Area |
|---|---|
| Status | Lapsed |
| Status since | 18 Aug 2025 |
| Application filed | 1 Feb 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 6.2 acres (2.5 ha) |
| Forest land | 6.2 acres (2.5 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Chikkoti |
| Taluk / tehsil | Yellapur |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-07682 |
In context
529 applications in Uttara Kannada since January 2022 are in the same category (Telecom): 181 approved, 43 filed or under review, and 277 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 6.2 acres, this one is larger than 99% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chikkoti, Yellapur, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Underground OFC laying under USO 4G saturation project in Manchikeri Range… — lapsed, 0 m away
- Bsnl 4g Saturation Tower Project Aalwada — forest land use approved, 2.8 km away
- PROVIDING UG OFC CONNECTIVITY TO MALALGAON,BALGIMANE,ILLEHALLI,HARIGADDE,BEEJAN… — lapsed, 3.9 km away
- Establishment of Sanskrit Vaidik Collège in Ummachagi — lapsed, 3.9 km away
- Bsnl 4g Saturation Tower Project Somnalli — forest land use approved, 6.1 km away
- Bsnl 4g Tower Saturation Project Bilki — forest land use approved, 6.1 km away
- Lease Land Renewal of School — lapsed, 6.2 km away
- Deep Junglewood House — lapsed, 6.8 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.