Quick answers
What is this project?
Bsnl Usof 4g Saturation Project at Morse - Ofc Route Is Proposed for Connectivity is a telecom project in Morse, Kumta, Uttara Kannada, Karnataka. The site covers 1.1 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Decision issued” (since 10 Apr 2024), as of 27 Nov 2026.
Where is it?
In Morse, Kumta, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹95 lakh and a site of 1.1 acres.
When was it filed?
The application was filed on 10 Apr 2024.
Project details
| Status | Decision issued |
|---|---|
| Status since | 10 Apr 2024 |
| Application filed | 10 Apr 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 1.1 acres (0.4 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Morse |
| Taluk / tehsil | Kumta |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site area on record |
| Our reference | WID-KA-07933 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 9 Jul 2024 | Lapsed | 1.1 acres | ₹95 lakh |
| New project filed 10 Apr 2024 (this page) | Decision issued | 1.1 acres | ₹95 lakh |
| New project filed 21 Jan 2024 | More information requested | 1.1 acres | ₹95 lakh |
In context
529 applications in Uttara Kannada since January 2022 are in the same category (Telecom): 181 approved, 43 filed or under review, and 277 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 1.1 acres, this one is larger than 90% of them.
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Morse, Kumta, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl Usof 4g Saturation Project at Morse - Ofc Route Is Proposed for… — lapsed, 0 m away
- Bsnl Usof 4g Saturation Project at Morse - Ofc Route Is Proposed for… — more information requested, 250 m away
- Bsnlusof4gsaturationprojectatbanganevillage-Ofcroute Isproposedforconnectivity — lapsed, 500 m away
- Bsnlusof4gsaturationprojectatbanganevillage-Ofcroute Isproposedforconnectivity — forest land use approved, 500 m away
- Bsnlusof4gsaturationprojectatbanganevillage-Ofcroute Isproposedforconnectivity — decision issued, 550 m away
- USO 4G mobile tower at Bangane — under wildlife review, 550 m away
- USO 4G mobile tower at Bangane — forest land use approved, 550 m away
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — lapsed, 2.5 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.