Quick answers
What is this project?
Bsnlusof4gsaturationprojectat Ashikeri Village-Ofcroute Isproposedforconnectivity is a proposed building project in Ashikeri, Honavar, Uttara Kannada, Karnataka. The site covers 1.1 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Ashikeri, Honavar, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹95 lakh and a site of 1.1 acres.
When was it filed?
The application was filed on 9 Apr 2024.
Project details
| Status | More information requested |
|---|---|
| Status since | 9 Apr 2024 |
| Application filed | 9 Apr 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahesh Nair |
| Land area | 1.1 acres (0.5 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Ashikeri |
| Taluk / tehsil | Honavar |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08003 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 4 Jul 2024 | Lapsed | 1.1 acres | ₹95 lakh |
| New project filed 16 Apr 2024 | Lapsed | 1.1 acres | ₹95 lakh |
| New project filed 9 Apr 2024 (this page) | More information requested | 1.1 acres | ₹95 lakh |
In context
93 applications in Uttara Kannada since January 2022 are in the same category (Buildings & townships): 6 approved, 27 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.1 acres, this one is larger than 54% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ashikeri, Honavar, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnlusof4gsaturationprojectat Ashikeri Village-Ofcroute… — lapsed, 0 m away
- Bsnlusof4gsaturationprojectat Ashikeri Village-Ofcroute… — lapsed, 0 m away
- Providing Fhtcs to 91 Households — more information requested, 1.9 km away
- 4g Saturation Project at Balemath — forest land use approved, 2.1 km away
- Bsnlusof4gsaturationprojectat Balemat Village-Ofcroute Isproposedforconnectivity — lapsed, 2.9 km away
- Bsnlusof4gsaturationprojectat Balemat Village-Ofcroute Isproposedforconnectivity — forest land use approved, 2.9 km away
- Bsnl 4g Saturation Project Anshikeri — under wildlife review, 3.1 km away
- Bsnl 4g Saturation Project Anshikeri — forest land use approved, 3.1 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review