Quick answers
What is Construction of Residential House by Varad Dinakar Naik?
This lapsed building project by Varad Dinakar Naik is in Belekeri, Ankola, Uttara Kannada, Karnataka. The site covers 0 acres.
Who is building it?
The applicant is Varad Dinakar Naik.
Has it been approved?
No. The application was lapsed on 26 May 2025, so it is no longer under consideration.
Where is it?
In Belekeri, Ankola, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹9 lakh and a site of 0 acres.
When was it filed?
The application was filed on 1 Jan 2025.
Project details
| Official title | Construction of Residential House |
|---|---|
| Status | Lapsed |
| Status since | 26 May 2025 |
| Application filed | 1 Jan 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Varad Dinakar Naik |
| Land area | 200 m² |
| Project cost | ₹9 lakh |
| Village / locality | Belekeri |
| Taluk / tehsil | Ankola |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08403 |
In context
93 applications in Uttara Kannada since January 2022 are in the same category (Buildings & townships): 6 approved, 27 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0 acres, this one is smaller than 99% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Belekeri, Ankola, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Residential House by Gopal Ramakrishna Nayhak — coastal clearance granted, 400 m away
- Request for Crz Clearance of Proposed Maintenance Dredging at Existing Fish… — coastal clearance granted, 1.1 km away
- CRZ NOC for Mentainance Dredging at fish landing centres at Harwada and… — lapsed, 1.1 km away
- Diversion of 1.6576 Ha. & Rediversion of 1.1621 Ha. forest land (totally… — more information requested, 3.3 km away
- Diversion of 1.465 Ha Forest land in F.Sy no 7,23&25 of Navagadda, 42A & 50A1A… — lapsed, 4.1 km away
- All-Weather Multi-Cargo Greenfield Deepwater Port near Ankola, Dist. Uttara… — under environmental review, 4.5 km away
- All-Weather Multi-Cargo Greenfield Deepwater Port near Ankola, Dist. Uttara… — under coastal review, 4.5 km away
- All-Weather Multi-Cargo Greenfield Deepwater Port near Ankola, Dist. Uttara… — cleared for impact study, 4.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.