Quick answers
What is this project?
This approved residential project by Gopal Ramakrishna Nayhak is in Belekeri, Ankola, Uttara Kannada, Karnataka. It plans 1 units in 1 tower on 0.1 acres.
Who is building it?
The applicant is Gopal Ramakrishna Nayhak.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 24 Jun 2025), as of 27 Nov 2026.
Where is it?
In Belekeri, Ankola, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹30 lakh and a site of 0.1 acres.
When was it filed?
The application was filed on 9 Apr 2025.
Project details
| Official title | Construction of Residential House |
|---|---|
| Status | Coastal clearance granted |
| Status since | 24 Jun 2025 |
| Application filed | 9 Apr 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Gopal Ramakrishna Nayhak |
| Use | Residential |
| Units | 1 |
| Towers | 1 |
| Land area | 400 m² |
| Built-up area | 213 m² (2,293 sq ft) |
| Plot area | 316 m² (3,401 sq ft) |
| Project cost | ₹30 lakh |
| Village / locality | Belekeri |
| Taluk / tehsil | Ankola |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08714 |
In context
93 applications in Uttara Kannada since January 2022 are in the same category (Buildings & townships): 6 approved, 27 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.1 acres, this one is smaller than 81% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Belekeri, Ankola, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Residential House by Varad Dinakar Naik — lapsed, 400 m away
- Request for Crz Clearance of Proposed Maintenance Dredging at Existing Fish… — coastal clearance granted, 1.4 km away
- CRZ NOC for Mentainance Dredging at fish landing centres at Harwada and… — lapsed, 1.4 km away
- Diversion of 1.6576 Ha. & Rediversion of 1.1621 Ha. forest land (totally… — more information requested, 3.4 km away
- Diversion of 1.465 Ha Forest land in F.Sy no 7,23&25 of Navagadda, 42A & 50A1A… — lapsed, 4 km away
- All-Weather Multi-Cargo Greenfield Deepwater Port near Ankola, Dist. Uttara… — under environmental review, 4.1 km away
- All-Weather Multi-Cargo Greenfield Deepwater Port near Ankola, Dist. Uttara… — under coastal review, 4.1 km away
- All-Weather Multi-Cargo Greenfield Deepwater Port near Ankola, Dist. Uttara… — cleared for impact study, 4.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.