Quick answers
What is Attle-I Small Hydroelectric Project (5 MW)?
Attle-I Small Hydroelectric Project (5 MW) is a rejected water and irrigation project in Palakkayam, Mannarkad, Palakkad, Kerala. The site covers 0.7 acres.
Who is building it?
The applicant is Darshan Hydro Power Projects Private Limited.
Has it been approved?
No. The application was rejected on 11 Mar 2026.
Where is it?
In Palakkayam, Mannarkad, Palakkad, Kerala.
How big is it?
It has a stated cost of ₹55 crore; a site of 0.7 acres and 2,830 m² of forest land.
When was it filed?
The application was filed on 10 Feb 2026.
Project details
| Status | Not approved |
|---|---|
| Status since | 11 Mar 2026 |
| Application filed | 10 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Darshan Hydro Power Projects Private Limited |
| Land area | 2,800 m² |
| Forest land | 2,830 m² |
| Project cost | ₹55 crore |
| Village / locality | Palakkayam |
| Taluk / tehsil | Mannarkad |
| District | Palakkad |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01791 |
In context
64 applications in Palakkad since January 2022 are in the same category (Water & irrigation): 44 approved, 8 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.7 acres, this one is larger than 84% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Palakkayam, Mannarkad, Palakkad, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Attle-I Small Hydroelectric Project (6 MW) — lapsed, 300 m away
- Attle-Ii Small Hydroelectric Project (4 MW) — not approved, 1.3 km away
- Attle-Ii Small Hydroelectric Project (6 MW) — lapsed, 1.6 km away
- Siruvani Drinking Water Supply Scheme — lapsed, 7.3 km away
- Laterite Building Stone Quarry of Mr. Babu K. P — under environmental review, 7.4 km away
- Providing 4G/5G coverage toUncovered Villages- Palakkad BA — in-principle approval, conditions pending, 7.4 km away
- Providing 4G/5G coverage toUncovered Villages- Palakkad BA — application filed, 7.4 km away
- Jjm-21-22 Laying Distribution System and Providing Fhtcs in Mundur Panchayath… — forest land use approved, 9.1 km away
More from Darshan Hydro Power Projects Private Limited in Palakkad
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.