Quick answers
What is Attle-I Small Hydroelectric Project (6 MW)?
Attle-I Small Hydroelectric Project (6 MW) is a lapsed water and irrigation project in Palakkayam, Mannarkad, Palakkad, Kerala. The site covers 2.4 acres.
Who is building it?
The applicant is Darshan Hydro Power Projects Private Limited.
Has it been approved?
No. The application was lapsed on 1 Sept 2023, so it is no longer under consideration.
Where is it?
In Palakkayam, Mannarkad, Palakkad, Kerala.
How big is it?
It has a stated cost of ₹54 crore; a site of 2.4 acres and 2.5 acres (1 ha) of forest land.
When was it filed?
The application was filed on 28 Mar 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Sept 2023 |
| Application filed | 28 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Darshan Hydro Power Projects Private Limited |
| Land area | 2.4 acres (1 ha) |
| Forest land | 2.5 acres (1 ha) |
| Project cost | ₹54 crore |
| Village / locality | Palakkayam |
| Taluk / tehsil | Mannarkad |
| District | Palakkad |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-02074 |
In context
64 applications in Palakkad since January 2022 are in the same category (Water & irrigation): 44 approved, 8 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 2.4 acres, this one is larger than 91% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Palakkayam, Mannarkad, Palakkad, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Attle-I Small Hydroelectric Project (5 MW) — not approved, 300 m away
- Attle-Ii Small Hydroelectric Project (4 MW) — not approved, 1.6 km away
- Attle-Ii Small Hydroelectric Project (6 MW) — lapsed, 1.9 km away
- Siruvani Drinking Water Supply Scheme — lapsed, 7.1 km away
- Providing 4G/5G coverage toUncovered Villages- Palakkad BA — in-principle approval, conditions pending, 7.3 km away
- Providing 4G/5G coverage toUncovered Villages- Palakkad BA — application filed, 7.3 km away
- Laterite Building Stone Quarry of Mr. Babu K. P — under environmental review, 7.7 km away
- Jjm-21-22 Laying Distribution System and Providing Fhtcs in Mundur Panchayath… — forest land use approved, 9 km away
More from Darshan Hydro Power Projects Private Limited in Palakkad
- Attle-I Small Hydroelectric Project (5 MW) — not approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.