Quick answers
What is Siruvani Drinking Water Supply Scheme?
Siruvani Drinking Water Supply Scheme is a lapsed water and irrigation project in Kallamala, Mannarkad, Palakkad, Kerala. The site covers 630.1 acres.
Who is building it?
The applicant is Department of Irrigation.
Has it been approved?
No. The application was lapsed on 25 Jul 2023, so it is no longer under consideration.
Where is it?
In Kallamala, Mannarkad, Palakkad, Kerala.
How big is it?
It has a site of 630.1 acres and 630.1 acres (255 ha) of forest land.
When was it filed?
The application was filed on 13 Mar 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Jul 2023 |
| Application filed | 13 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Department of Irrigation |
| Land area | 630.1 acres (255 ha) |
| Forest land | 630.1 acres (255 ha) |
| Village / locality | Kallamala |
| Taluk / tehsil | Mannarkad |
| District | Palakkad |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01993 |
In context
64 applications in Palakkad since January 2022 are in the same category (Water & irrigation): 44 approved, 8 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 630.1 acres, this one is larger than 95% of them.
Where it is
Kallamala, Mannarkad, Palakkad, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Attle-I Small Hydroelectric Project (6 MW) — lapsed, 7.1 km away
- Attle-I Small Hydroelectric Project (5 MW) — not approved, 7.3 km away
- Attle-Ii Small Hydroelectric Project (4 MW) — not approved, 8.4 km away
- Attle-Ii Small Hydroelectric Project (6 MW) — lapsed, 8.7 km away
- ADAP 2 2425 01/08 Kiliyakkad Road Concrete — lapsed, 10.2 km away
- ADAP 2 2425 01/08 Kiliyakkad Road Concrete — lapsed, 10.2 km away
- Jjm Thekkemalampuzha Drinking Water Pipe Carrying Bridge at Cherupuzhapalam — lapsed, 10.3 km away
- Jjm Thekkemalampuzha Drinking Water Pipe Carrying Bridge at Myladipalam — lapsed, 10.4 km away
More from Department of Irrigation in Palakkad
- Attappady Irrigation Project — under forest review
- Attappady Irrigation Project — returned to applicant
3 Department of Irrigation, Kerala projects in Palakkad
All 6 Department of Irrigation, Kerala projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.