Quick answers
What is this project?
Expansion of Existing Steel Plant with Iron Ore Beneficiation (3.36 MTPA), Pellets (3.205 MTPA), Sponge Iron (1.848 MTPA), Billets/MS Slab/ MS Bloom (2.881 MTPA), TMT bars/Angles/Sheets/Pipes (2.8298 MTPA), Ferro Alloys (0.216 MTPA), Pig Iron (0.289 MTPA) and Captive Power Generation (348 MW) is an approved mining project in Yerur, Chandrapur, Maharashtra. The site covers 304.1 acres.
Who is building it?
The applicant is Grace Industries LTD.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Jul 2023), as of 27 Nov 2026.
Where is it?
In Yerur, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹5,003 crore and a site of 304.1 acres.
When was it filed?
The application was filed on 11 Apr 2023.
Project details
| Official title | Expansion of Existing Steel Plant with Iron Ore Beneficiation (3.36 MTPA), Pellets (3.205 MTPA), Sponge Iron (1.848 MTPA), Billets/MS Slab/ MS Bloom (2.881 MTPA), TMT bars/Angles/Sheets/Pipes (2.8298 MTPA), Ferro Alloys (0.216 MTPA), Pig Iron (0.289 MTPA) and Captive Power Generation (348 MW) along with a private siding at Plot Nos.A-24, A-25, A-30, A-31, D-14 and private land over an area of 123.077 Ha at MIDC Chandrapur Tadali Growth Center, Maharastra. |
|---|---|
| Status | Environmental approval granted |
| Status since | 18 Jul 2023 |
| Application filed | 11 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Grace Industries LTD |
| Land area | 304.1 acres (123.1 ha) |
| Project cost | ₹5,003 crore |
| Village / locality | Yerur |
| Taluk / tehsil | Chandrapur |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-01327 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 11 Apr 2023 (this page) | Environmental approval granted | 304.1 acres | ₹5,003 crore |
| Early planning filed 2 Mar 2023 | Lapsed | 304.1 acres | ₹5,003 crore |
In context
341 applications in Chandrapur since January 2022 are in the same category (Mining): 280 approved, 28 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 304.1 acres, this one is larger than 76% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Yerur, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Name change of M/s. Grace Industries Ltd. for Expansion of Existing Steel… — withdrawn, 0 m away
- Name Change of M/s. Grace Industries Ltd. at Plot No. A-23, A-24, A-25,… — withdrawn, 0 m away
- Expansion of Existing Steel Plant with Iron Ore Beneficiation (3.36 MTPA),… — lapsed, 0 m away
- Grain Base fuel ethanol unit of 200 KLD, 5.5 MW Co- generation power plant By… — lapsed, 1.1 km away
- Grain Base fuel ethanol unit of 200 KLD, 5.5 MW Co- generation power plant By… — environmental approval granted, 1.1 km away
- Proposed Expansion of Sponge Iron Plant from 1,87,500 TPA (2 x 100 TPD and 1 x… — initial checks, 1.1 km away
- "Proposed Expansion of manufacturing plant with Sponge Iron from 90,000 TPA to… — cleared for impact study, 1.7 km away
- Cement manufacturing with Clinker Plant for 1.0 MTPA & Cement Plant for 3.0… — cleared for impact study, 1.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.