What is Developing? Open the mapMap

Environmental approval grantedMining · Chandrapur, Maharashtra

Expansion of Existing Steel Plant with Iron Ore Beneficiation (3.36 MTPA), Pellets (3.205 MTPA), Sponge Iron (1.848 MTPA), Billets/MS Slab/ MS Bloom (2.881 MTPA), TMT bars/Angles/Sheets/Pipes (2.8298 MTPA), Ferro Alloys (0.216 MTPA), Pig Iron (0.289 MTPA) and Captive Power Generation (348 MW)

Expansion of Existing Steel Plant with Iron Ore Beneficiation (3.36 MTPA), Pellets (3.205 MTPA), Sponge Iron (1.848 MTPA), Billets/MS Slab/ MS Bloom (2.881 MTPA), TMT bars/Angles/Sheets/Pipes (2.8298 MTPA), Ferro Alloys (0.216 MTPA), Pig Iron (0.289 MTPA) and Captive Power Generation (348 MW) is an approved mining project in Yerur, Chandrapur, Maharashtra. The site covers 304.1 acres. Its stated project cost is ₹5,003 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 18 Jul 2023).

See it on the live map All projects in Chandrapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Existing Steel Plant with Iron Ore Beneficiation (3.36 MTPA), Pellets (3.205 MTPA), Sponge Iron (1.848 MTPA), Billets/MS Slab/ MS Bloom (2.881 MTPA), TMT bars/Angles/Sheets/Pipes (2.8298 MTPA), Ferro Alloys (0.216 MTPA), Pig Iron (0.289 MTPA) and Captive Power Generation (348 MW) is an approved mining project in Yerur, Chandrapur, Maharashtra. The site covers 304.1 acres.

Who is building it?

The applicant is Grace Industries LTD.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 18 Jul 2023), as of 27 Nov 2026.

Where is it?

In Yerur, Chandrapur, Maharashtra.

How big is it?

It has a stated cost of ₹5,003 crore and a site of 304.1 acres.

When was it filed?

The application was filed on 11 Apr 2023.

Project details

Official titleExpansion of Existing Steel Plant with Iron Ore Beneficiation (3.36 MTPA), Pellets (3.205 MTPA), Sponge Iron (1.848 MTPA), Billets/MS Slab/ MS Bloom (2.881 MTPA), TMT bars/Angles/Sheets/Pipes (2.8298 MTPA), Ferro Alloys (0.216 MTPA), Pig Iron (0.289 MTPA) and Captive Power Generation (348 MW) along with a private siding at Plot Nos.A-24, A-25, A-30, A-31, D-14 and private land over an area of 123.077 Ha at MIDC Chandrapur Tadali Growth Center, Maharastra.
StatusEnvironmental approval granted
Status since18 Jul 2023
Application filed11 Apr 2023
Approval soughtEnvironmental approval
Application typeExpansion
SectorMining
ApplicantGrace Industries LTD
Land area304.1 acres (123.1 ha)
Project cost₹5,003 crore
Village / localityYerur
Taluk / tehsilChandrapur
DistrictChandrapur
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-01327

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 11 Apr 2023 (this page)Environmental approval granted304.1 acres₹5,003 crore
Early planning filed 2 Mar 2023Lapsed304.1 acres₹5,003 crore

In context

341 applications in Chandrapur since January 2022 are in the same category (Mining): 280 approved, 28 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 304.1 acres, this one is larger than 76% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Yerur, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.