Name Change of M/s. Grace Industries Ltd. at Plot No. A-23, A-24, A-25, A-30,A-31, D-14 Tadali Growth Centre, MIDC, Chandrapur, Maharashtra from expansion of the existing steel plant with Iron Ore Beneficiation (3.36 MTPA), Pellets (3.205 MTPA), Sponge Iron (1.848 MTPA), Billets/ MS slab/MS Bloom (2.881 MTPA), TMT Bars/ Angles/ Sheets/ Pipes (2.8298 MTPA), Ferro Alloys (0.216 MTPA), Pig Iron( 0.289 MTPA) & CPP (348 MW)

Name Change of M/s. Grace Industries Ltd. at Plot No. A-23, A-24, A-25, A-30,A-31, D-14 Tadali Growth Centre, MIDC, Chandrapur, Maharashtra from expansion of the existing steel plant with Iron Ore Beneficiation (3.36 MTPA), Pellets (3.205 MTPA), Sponge Iron (1.848 MTPA), Billets/ MS slab/MS Bloom (2.881 MTPA), TMT Bars/ Angles/ Sheets/ Pipes (2.8298 MTPA), Ferro Alloys (0.216 MTPA), Pig Iron( 0.289 MTPA) & CPP (348 MW) is a withdrawn mining project in Yerur, Chandrapur, Maharashtra. The site covers 304.1 acres. Its stated project cost is ₹5,003 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 6 May 2026).

See it on the live map All projects in Chandrapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Name Change of M/s. Grace Industries Ltd. at Plot No. A-23, A-24, A-25, A-30,A-31, D-14 Tadali Growth Centre, MIDC, Chandrapur, Maharashtra from expansion of the existing steel plant with Iron Ore Beneficiation (3.36 MTPA), Pellets (3.205 MTPA), Sponge Iron (1.848 MTPA), Billets/ MS slab/MS Bloom (2.881 MTPA), TMT Bars/ Angles/ Sheets/ Pipes (2.8298 MTPA), Ferro Alloys (0.216 MTPA), Pig Iron( 0.289 MTPA) & CPP (348 MW) is a withdrawn mining project in Yerur, Chandrapur, Maharashtra. The site covers 304.1 acres.

Who is building it?

The applicant is Sanvijay Alloys and Power Limited.

Has it been approved?

No. The application was withdrawn on 6 May 2026, so it is no longer under consideration.

Where is it?

In Yerur, Chandrapur, Maharashtra.

How big is it?

It has a stated cost of ₹5,003 crore and a site of 304.1 acres.

When was it filed?

The application was filed on 6 May 2026.

Project details

Official titleName Change of M/s. Grace Industries Ltd. at Plot No. A-23, A-24, A-25, A-30,A-31, D-14 Tadali Growth Centre, MIDC, Chandrapur, Maharashtra from expansion of the existing steel plant with Iron Ore Beneficiation (3.36 MTPA), Pellets (3.205 MTPA), Sponge Iron (1.848 MTPA), Billets/ MS slab/MS Bloom (2.881 MTPA), TMT Bars/ Angles/ Sheets/ Pipes (2.8298 MTPA), Ferro Alloys (0.216 MTPA), Pig Iron( 0.289 MTPA) & CPP (348 MW) along with a private siding to M/s. Sanvijay Alloys and Power Ltd.
StatusWithdrawn
Status since6 May 2026
Application filed6 May 2026
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorMining
ApplicantSanvijay Alloys and Power Limited
Land area304.1 acres (123.1 ha)
Project cost₹5,003 crore
Village / localityYerur
Taluk / tehsilChandrapur
DistrictChandrapur
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-13498

In context

341 applications in Chandrapur since January 2022 are in the same category (Mining): 280 approved, 28 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 304.1 acres, this one is larger than 76% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Yerur, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sanvijay Alloys and Power Limited in Chandrapur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.