Regularization of Existing Standalone Rolling Mill with Expansion of Existing Secondary metallurgical processing unit by replacing 12T IF to 30T IF and 20T IF to 30T IF is a proposed industrial project in Jalna, Maharashtra. The site covers 7.4 acres.
Who is building it?
The applicant is Jalna Siddhivinayak Alloys Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 13 Jul 2023), as of 27 Nov 2026.
Where is it?
In Jalna, Maharashtra.
How big is it?
It has a stated cost of ₹48 crore and a site of 7.4 acres.
When was it filed?
The application was filed on 13 Jul 2023.
Project details
| Official title | Regularization of Existing Standalone Rolling Mill with Expansion of Existing Secondary metallurgical processing unit by replacing 12T IF to 30T IF and 20T IF to 30T IF along with installation of 2x30T Induction Furnace to manufacture 4,95,000 TPA (earlier 99,000 TPA) Hot metal; 4,85,100 TPA (earlier 2,70,000 TPA) TMT Bar at Plot No. C-4/1/1, C-4/1/2, C-52, C-53 & P-9, Additional MIDC Area, Jalna, Dist: Jalna, Maharashtra by M/s. Jalna Siddhivinayak Alloys Pvt Ltd. |
|---|---|
| Status | Cleared for impact study |
| Status since | 13 Jul 2023 |
| Application filed | 13 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Jalna Siddhivinayak Alloys Private Limited |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹48 crore |
| Village / locality | Jalna |
| Taluk / tehsil | Jalna |
| District | Jalna |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-01666 |
In context
36 applications in Jalna since January 2022 are in the same category (Industry): 26 approved, 4 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.4 acres, this one is smaller than 72% of them.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jalna, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Secondary metallurgical processing unit by replacing 12T… — cleared for impact study, 0 m away
- Plant for Mild Steel Ingots (233 MTD) and Heavy metal alloy (70 TPD) at Plot… — lapsed, 150 m away
- Proposed Expansion Industrial Shed Construction Project located at Plot No.… — initial checks, 250 m away
- Manufacture of M.S. Round Bars, Angles, Channels & TMT Bars with capacity 200… — more information requested, 450 m away
- Manufacture of TMT Bar with capacity 1000 TPD Stand-alone Rolling Mill… — cleared for impact study, 1.2 km away
- Expansion of Integrated Steel Plant for additional product 6000 TPD… — cleared for impact study, 1.3 km away
- Modification and Expansion of Existing Scrap Processing Unit with Addition of… — cleared for impact study, 1.7 km away
- Ferro-Alloys unit to manufacture 66,000 TPA (FeMn/ SiMn) by Installing 2x18… — cleared for impact study, 1.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.