Quick answers
What is this project?
Proposed Expansion Industrial Shed Construction Project located at Plot No. C-6 Additional Industrial Area, Jalna Tal. & Dist. – Jalna by M/s. NRB Bearings Limited is a proposed building project in Jamwadi, Jalna, Maharashtra. The site covers 15.4 acres.
Who is building it?
The applicant is Nrb Bearings Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Jamwadi, Jalna, Maharashtra.
How big is it?
It has a stated cost of ₹578.9 crore and a site of 15.4 acres.
When was it filed?
The application was filed on 26 Oct 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 26 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Nrb Bearings Limited |
| Land area | 15.4 acres (6.2 ha) |
| Project cost | ₹578.9 crore |
| Village / locality | Jamwadi |
| Taluk / tehsil | Jalna |
| District | Jalna |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13891 |
In context
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jamwadi, Jalna, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Plant for Mild Steel Ingots (233 MTD) and Heavy metal alloy (70 TPD) at Plot… — lapsed, 150 m away
- Manufacture of M.S. Round Bars, Angles, Channels & TMT Bars with capacity 200… — more information requested, 150 m away
- Expansion of Existing Secondary metallurgical processing unit by replacing 12T… — cleared for impact study, 250 m away
- Regularization of Existing Standalone Rolling Mill with Expansion of Existing… — cleared for impact study, 250 m away
- Manufacture of TMT Bar with capacity 1000 TPD Stand-alone Rolling Mill… — cleared for impact study, 950 m away
- Expansion of Integrated Steel Plant for additional product 6000 TPD… — cleared for impact study, 1.2 km away
- Modification and Expansion of Existing Scrap Processing Unit with Addition of… — cleared for impact study, 1.6 km away
- Ferro-Alloys unit to manufacture 66,000 TPA (FeMn/ SiMn) by Installing 2x18… — cleared for impact study, 1.6 km away
About this information