What is this project?
Expansion of Existing Secondary metallurgical processing unit by replacing 12T IF to 30T IF and 20T IF to 30T IF is a proposed industrial project in Daregaon (Jalna), Jalna, Maharashtra. The site covers 8.9 acres.
Who is building it?
The applicant is Bindra Steel Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 5 Aug 2024), as of 27 Nov 2026.
Where is it?
In Daregaon (Jalna), Jalna, Maharashtra.
How big is it?
It has a stated cost of ₹73 crore and a site of 8.9 acres.
When was it filed?
The application was filed on 2 Aug 2024.
Project details
| Official title | Expansion of Existing Secondary metallurgical processing unit by replacing 12T IF to 30T IF and 20T IF to 30T IF along with installation of 2x30T Induction Furnace to manufacture 4,95,000 TPA (Earlier 1,05,690 TPA) Hot metal; 4,85,100 TPA & (Earlier 2,70,000 TPA Standalone Rolling Mill by Reheating Furnace) TMT Bar at Plot No. C-4/1/1, C-4/1/2, C-52, C-53 & P-9, Additional MIDC Area, Jalna, Dist: Jalna, Maharashtra by M/s. Bindra Steel Private Limited. |
|---|---|
| Status | Cleared for impact study |
| Status since | 5 Aug 2024 |
| Application filed | 2 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Bindra Steel Private Limited |
| Land area | 8.9 acres (3.6 ha) |
| Project cost | ₹73 crore |
| Village / locality | Daregaon (Jalna) |
| Taluk / tehsil | Jalna |
| District | Jalna |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03681 |
In context
36 applications in Jalna since January 2022 are in the same category (Industry): 26 approved, 4 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 8.9 acres, this one is smaller than 69% of them.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Daregaon (Jalna), Jalna, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regularization of Existing Standalone Rolling Mill with Expansion of Existing… — cleared for impact study, 0 m away
- Plant for Mild Steel Ingots (233 MTD) and Heavy metal alloy (70 TPD) at Plot… — lapsed, 100 m away
- Proposed Expansion Industrial Shed Construction Project located at Plot No.… — initial checks, 250 m away
- Manufacture of M.S. Round Bars, Angles, Channels & TMT Bars with capacity 200… — more information requested, 400 m away
- Manufacture of TMT Bar with capacity 1000 TPD Stand-alone Rolling Mill… — cleared for impact study, 1.2 km away
- Expansion of Integrated Steel Plant for additional product 6000 TPD… — cleared for impact study, 1.3 km away
- Modification and Expansion of Existing Scrap Processing Unit with Addition of… — cleared for impact study, 1.7 km away
- Ferro-Alloys unit to manufacture 66,000 TPA (FeMn/ SiMn) by Installing 2x18… — cleared for impact study, 1.7 km away
More from Bindra Steel Private Limited in Jalna
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.