Quick answers
What is this project?
Minor Mineral Stone & Murrum Quarry Project Lease Area: 1.00 Ha, Survey/Gat No.: 126 (Part), Land type: Pvt. Land, Mouza: Wanjar Umrad, Tal: Jalna, Dist: Jalna, State: Maharashtra is an approved mining project in Wanjar Umrad, Jalna, Maharashtra. The site covers 2.5 acres.
Who is building it?
The applicant is Swati Wagh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 31 Mar 2023), as of 27 Nov 2026.
Where is it?
In Wanjar Umrad, Jalna, Maharashtra.
How big is it?
It has a stated cost of ₹72 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 31 Mar 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 31 Mar 2023 |
| Application filed | 31 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Swati Wagh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹72 lakh |
| Village / locality | Wanjar Umrad |
| Taluk / tehsil | Jalna |
| District | Jalna |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-02981 |
In context
180 applications in Jalna since January 2022 are in the same category (Mining): 170 approved, 0 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 37 days from filing to approval. At 2.5 acres, this one is smaller than 99% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Wanjar Umrad, Jalna, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — lapsed, 6.9 km away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — lapsed, 6.9 km away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — lapsed, 6.9 km away
- Diversion of 0.121 Ha. Forest Land for Underground Ofc Duct and Cable Within… — lapsed, 7 km away
- Diversion of Forest Land for Laying Underground Optical Fiber Cable along the… — lapsed, 7.1 km away
- Khadgaon (Stone & Murrum) Quarry Project having Mine Lease Area: 1.00 Ha.,… — environmental approval granted, 8.8 km away
- Regularization of Existing Standalone Rolling Mill with Expansion of Existing… — cleared for impact study, 9.4 km away
- Plant for Mild Steel Ingots (233 MTD) and Heavy metal alloy (70 TPD) at Plot… — lapsed, 9.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.