Quick answers
What is this project?
Diversion of 0.121 Ha. Forest Land for Underground Ofc Duct and Cable Within Row of Existing (Nh-753a) Jalna City Bypass Road, Road Passing Through Forest Land at Vill- Jalna City Tal. Jalna, Dist.–jalna is a lapsed telecom project in Jalna, Maharashtra. The site covers 0.3 acres.
Who is building it?
The applicant is Yogesh Khandave.
Has it been approved?
No. The application was lapsed on 11 Oct 2023, so it is no longer under consideration.
Where is it?
In Jalna, Maharashtra.
How big is it?
It has a stated cost of ₹6 lakh; a site of 0.3 acres and 1,210 m² of forest land.
When was it filed?
The application was filed on 6 Jul 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 11 Oct 2023 |
| Application filed | 6 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Yogesh Khandave |
| Land area | 1,200 m² |
| Forest land | 1,210 m² |
| Project cost | ₹6 lakh |
| Village / locality | Jalna |
| Taluk / tehsil | Jalna |
| District | Jalna |
| State | Maharashtra |
| Location from | Site area on record |
| Our reference | WID-MH-15633 |
In context
6 applications in Jalna since January 2022 are in the same category (Telecom): 0 approved, 0 filed or under review, and 6 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jalna, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — lapsed, 100 m away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — lapsed, 100 m away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — lapsed, 100 m away
- Diversion of Forest Land for Laying Underground Optical Fiber Cable along the… — lapsed, 200 m away
- Regularization of Existing Standalone Rolling Mill with Expansion of Existing… — cleared for impact study, 5.9 km away
- Expansion of Existing Secondary metallurgical processing unit by replacing 12T… — cleared for impact study, 6 km away
- Plant for Mild Steel Ingots (233 MTD) and Heavy metal alloy (70 TPD) at Plot… — lapsed, 6 km away
- Proposed Expansion Industrial Shed Construction Project located at Plot No.… — initial checks, 6.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.