Quick answers
What is this project?
Diversion of Forest Land for Laying Underground Optical Fiber Cable along the road in RoW of NH-753A & NH-753 C from Forest Training Institute to Sindkhed Raja Chaufuli in Jalna City, Tal & Dist. Jalna in State of Maharashtra is a lapsed telecom project in Jalna, Maharashtra. It seeks 0.4 acres of forest land.
Who is building it?
The applicant is Bharti Airtel Limited.
Has it been approved?
No. The application was lapsed on 28 Oct 2026, so it is no longer under consideration.
Where is it?
In Jalna, Maharashtra.
How big is it?
It has a stated cost of ₹15 lakh and 1,790 m² of forest land.
When was it filed?
The application was filed on 1 Jan 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 Oct 2026 |
| Application filed | 1 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Forest land | 1,790 m² |
| Project cost | ₹15 lakh |
| Village / locality | Jalna |
| Taluk / tehsil | Jalna |
| District | Jalna |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15326 |
In context
6 applications in Jalna since January 2022 are in the same category (Telecom): 0 approved, 0 filed or under review, and 6 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jalna, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.121 Ha. Forest Land for Underground Ofc Duct and Cable Within… — lapsed, 200 m away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — lapsed, 200 m away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — lapsed, 200 m away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — lapsed, 200 m away
- Regularization of Existing Standalone Rolling Mill with Expansion of Existing… — cleared for impact study, 6.1 km away
- Expansion of Existing Secondary metallurgical processing unit by replacing 12T… — cleared for impact study, 6.1 km away
- Plant for Mild Steel Ingots (233 MTD) and Heavy metal alloy (70 TPD) at Plot… — lapsed, 6.2 km away
- Proposed Expansion Industrial Shed Construction Project located at Plot No.… — initial checks, 6.3 km away
More from Bharti Airtel Limited in Jalna
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — lapsed
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — lapsed
3 Bharti Airtel (Airtel) projects in Jalna
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.