Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD

Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD is a proposed industrial project in Adgaon[Darade], Sailu, Parbhani, Maharashtra. The site covers 55.8 acres. Its stated project cost is ₹234.4 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 30 Jun 2023).

See it on the live map All projects in Parbhani

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD is a proposed industrial project in Adgaon[Darade], Sailu, Parbhani, Maharashtra. The site covers 55.8 acres.

Who is building it?

The applicant is Shree Tuljabhavani Sugar Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 30 Jun 2023), as of 27 Nov 2026.

Where is it?

In Adgaon[Darade], Sailu, Parbhani, Maharashtra.

How big is it?

It has a stated cost of ₹234.4 crore and a site of 55.8 acres.

When was it filed?

The application was filed on 16 Jun 2023.

One of 5 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD

Project details

Official titleProposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD, Along with Establishment of 250 KLPD Syrup Based Distillery/ 200 KLPD B- Molasses/C- Molasses Based Distillery to Produce RS/ENA/Ethanol & Expansion of Existing Co-Generation Power Plant from 3 MW to 6.5 MW by M/s. Shree Tuljabhavani Sugar Private Limited at Gat No. 265, 266, 272, 273, 274, 275 of Adgaon Darade village & Gat No.28, 29, 30 of Rajura village, Taluka Selu, District Parbhani, Maharashtra.
StatusCleared for impact study
Status since30 Jun 2023
Application filed16 Jun 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantShree Tuljabhavani Sugar Private Limited
Land area55.8 acres (22.6 ha)
Project cost₹234.4 crore
Village / localityAdgaon[Darade]
Taluk / tehsilSailu
DistrictParbhani
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-03015

All filings for this project

This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 Apr 2026Environmental approval granted55.8 acres₹234.4 crore
Amendment filed 14 May 2025Cleared for impact study55.8 acres₹234.4 crore
New project filed 1 Jul 2024Lapsed55.8 acres₹234.4 crore
New project filed 7 Feb 2024Returned to applicant55.8 acres₹234.4 crore
Early planning filed 16 Jun 2023 (this page)Cleared for impact study55.8 acres₹234.4 crore

In context

12 applications in Parbhani since January 2022 are in the same category (Industry): 9 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 55.8 acres, this one is smaller than 100% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Adgaon[Darade], Sailu, Parbhani, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.