Quick answers
What is this project?
Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD is a proposed industrial project in Adgaon[Darade], Sailu, Parbhani, Maharashtra. The site covers 55.8 acres.
Who is building it?
The applicant is Shree Tuljabhavani Sugar Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 2 Jun 2025), as of 27 Nov 2026.
Where is it?
In Adgaon[Darade], Sailu, Parbhani, Maharashtra.
How big is it?
It has a stated cost of ₹234.4 crore and a site of 55.8 acres.
When was it filed?
The application was filed on 14 May 2025.
One of 5 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD
Project details
| Official title | Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD, Along with Establishment of 250 KLPD Syrup Based Distillery/ 200 KLPD B- Molasses/C- Molasses Based Distillery to Produce RS/ENA/Ethanol & Expansion of Existing Co-Generation Power Plant from 3 MW to 6.5 MW by M/s. Shree Tuljabhavani Sugar Private Limited at Gat No. 265, 266, 272, 273, 274, 275 of Adgaon Darade village & Gat No.28, 29, 30 of Rajura village, Taluka Selu, District Parbhani, Maharashtra. |
|---|---|
| Status | Cleared for impact study |
| Status since | 2 Jun 2025 |
| Application filed | 14 May 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Shree Tuljabhavani Sugar Private Limited |
| Land area | 55.8 acres (22.6 ha) |
| Project cost | ₹234.4 crore |
| Village / locality | Adgaon[Darade] |
| Taluk / tehsil | Sailu |
| District | Parbhani |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-10687 |
All filings for this project
This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Apr 2026 | Environmental approval granted | 55.8 acres | ₹234.4 crore |
| Amendment filed 14 May 2025 (this page) | Cleared for impact study | 55.8 acres | ₹234.4 crore |
| New project filed 1 Jul 2024 | Lapsed | 55.8 acres | ₹234.4 crore |
| New project filed 7 Feb 2024 | Returned to applicant | 55.8 acres | ₹234.4 crore |
| Early planning filed 16 Jun 2023 | Cleared for impact study | 55.8 acres | ₹234.4 crore |
In context
12 applications in Parbhani since January 2022 are in the same category (Industry): 9 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 55.8 acres, this one is smaller than 100% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Adgaon[Darade], Sailu, Parbhani, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD — environmental approval granted, 0 m away
- Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD — lapsed, 0 m away
- Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD — returned to applicant, 0 m away
- Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD — cleared for impact study, 0 m away
- Stone Quarry proposal of Mr. Dattatraya Rameshrao Solanke , Khasara No.144 P ,… — environmental approval granted, 2.3 km away
- Proposed Stone Quarry located at Survey/Gut No.: 110 (Part), Village: Adgaon… — lapsed, 3.5 km away
- Proposed Expressway Connector to Hindu Hrudaysamarat Balasaheb Thackeray… — environmental approval granted, 4.4 km away
- Transfer of Environmental Clearance of Takli Nilwarn Sand Ghat, Parbhani from… — environmental approval granted, 9.5 km away
All 5 Shree Tuljabhavani Sugar projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.