Quick answers
What is this project?
Proposed Stone Quarry located at Survey/Gut No.: 110 (Part), Village: Adgaon Darade, Taluka: Selu, District: Parbhani, State: Maharashtra, Mine Lease Area: 1.00 Ha. by Sou. Radhika RamPrasad Kadam Bordikar is a lapsed mining project in Adgaon[Darade], Sailu, Parbhani, Maharashtra. The site covers 2.5 acres.
Who is building it?
The applicant is Radhika Bordikar Kadam.
Has it been approved?
No. The application was lapsed on 26 Oct 2025, so it is no longer under consideration.
Where is it?
In Adgaon[Darade], Sailu, Parbhani, Maharashtra.
How big is it?
It has a stated cost of ₹79 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 4 Jul 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Oct 2025 |
| Application filed | 4 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Radhika Bordikar Kadam |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹79 lakh |
| Village / locality | Adgaon[Darade] |
| Taluk / tehsil | Sailu |
| District | Parbhani |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-04051 |
In context
172 applications in Parbhani since January 2022 are in the same category (Mining): 147 approved, 0 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.5 acres, this one is smaller than 99% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Adgaon[Darade], Sailu, Parbhani, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Stone Quarry proposal of Mr. Dattatraya Rameshrao Solanke , Khasara No.144 P ,… — environmental approval granted, 1.5 km away
- Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD — environmental approval granted, 3.5 km away
- Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD — cleared for impact study, 3.5 km away
- Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD — lapsed, 3.5 km away
- Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD — returned to applicant, 3.5 km away
- Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD — cleared for impact study, 3.5 km away
- Proposed Expressway Connector to Hindu Hrudaysamarat Balasaheb Thackeray… — environmental approval granted, 4.1 km away
- Transfer of Environmental Clearance of Pimpalgaon Gayake Sand Ghat, Parbhani,… — environmental approval granted, 10.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.