What is Developing? Open the mapMap

Environmental approval grantedIndustry · Parbhani, Maharashtra

Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD

Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD is an approved industrial project in Adgaon[Darade], Sailu, Parbhani, Maharashtra. The site covers 55.8 acres. Its stated project cost is ₹234.4 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 10 Aug 2026).

See it on the live map All projects in Parbhani

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD is an approved industrial project in Adgaon[Darade], Sailu, Parbhani, Maharashtra. The site covers 55.8 acres.

Who is building it?

The applicant is Shree Tuljabhavani Sugar Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 10 Aug 2026), as of 27 Nov 2026.

Where is it?

In Adgaon[Darade], Sailu, Parbhani, Maharashtra.

How big is it?

It has a stated cost of ₹234.4 crore and a site of 55.8 acres.

When was it filed?

The application was filed on 30 Apr 2026.

Project details

Official titleProposed Expansion of Existing Sugar Unit from 1250 TCD to 3500 TCD, Along with Establishment of 250 KLPD Syrup Based Distillery/ 200 KLPD B- Molasses/C- Molasses Based Distillery to Produce RS/ENA/Ethanol & Expansion of Existing Co-Generation Power Plant from 3 MW to 6.5 MW by M/s. Shree Tuljabhavani Sugar Private Limited at Gat No. 265, 266, 272, 273, 274, 275 of Adgaon Darade village & Gat No.28, 29, 30 of Rajura village, Taluka Selu, District Parbhani, Maharashtra.
StatusEnvironmental approval granted
Status since10 Aug 2026
Application filed30 Apr 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantShree Tuljabhavani Sugar Private Limited
Land area55.8 acres (22.6 ha)
Project cost₹234.4 crore
Village / localityAdgaon[Darade]
Taluk / tehsilSailu
DistrictParbhani
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-14334

All filings for this project

This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 Apr 2026 (this page)Environmental approval granted55.8 acres₹234.4 crore
Amendment filed 14 May 2025Cleared for impact study55.8 acres₹234.4 crore
New project filed 1 Jul 2024Lapsed55.8 acres₹234.4 crore
New project filed 7 Feb 2024Returned to applicant55.8 acres₹234.4 crore
Early planning filed 16 Jun 2023Cleared for impact study55.8 acres₹234.4 crore

In context

12 applications in Parbhani since January 2022 are in the same category (Industry): 9 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 55.8 acres, this one is smaller than 100% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Adgaon[Darade], Sailu, Parbhani, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 5 Shree Tuljabhavani Sugar projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.