Quick answers
What is this project?
Expansion of Distillery from 45 to 200 KLPD (B & C Heavy Molasses/Cane Juice/ Syrup), Sugar Factory from 5000 to 7000 TCD & Cogeneration from 28 to 33 MW by Green Power Sugars Limited is a proposed industrial project in Gopuj, Khatav, Satara, Maharashtra. The site covers 145.4 acres.
Who is building it?
The applicant is Green Power Sugars Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Gopuj, Khatav, Satara, Maharashtra.
How big is it?
It has a stated cost of ₹565.6 crore and a site of 145.4 acres.
When was it filed?
The application was filed on 30 Dec 2024.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 17 Jan 2025 |
| Application filed | 30 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Green Power Sugars Limited |
| Land area | 145.4 acres (58.9 ha) |
| Project cost | ₹565.6 crore |
| Village / locality | Gopuj |
| Taluk / tehsil | Khatav |
| District | Satara |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-04083 |
In context
36 applications in Satara since January 2022 are in the same category (Industry): 23 approved, 10 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 145.4 acres, this one is larger than 89% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gopuj, Khatav, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Molasses Distillery from 45 KLPD to 200 KLPD using Molasses (B &… — cleared for impact study, 0 m away
- Environmental Consent for Additional 50% Increase in Distillery Production… — initial checks, 150 m away
- Environmental Consent for Additional 50 Percent Increase in Distillery… — initial checks, 150 m away
- Diversion of Forest Land for Laying Optical Fiber Cable With in Row of the… — in-principle approval, conditions pending, 10.1 km away
- Diversion of Forest Land for Laying Optical Fiber Cable Within Row of the… — lapsed, 11.8 km away
- Proposed Molasses and Cane Juice Based Distillery/ Grain based Distillery (RS/… — environmental approval granted, 11.9 km away
- Environmental Clearance for Basalt Stone Quarry having area 2.00 Ha of Shri.… — environmental approval granted, 14.1 km away
- Diversion of Forest Land at Proposed Location No.07 of Construction of 132KV… — lapsed, 15.7 km away
More from Green Power Sugars Limited in Satara
- Environmental Consent for Additional 50% Increase in Distillery Production… — initial checks
- Environmental Consent for Additional 50 Percent Increase in Distillery… — initial checks
- Expansion of Molasses Distillery from 45 KLPD to 200 KLPD using Molasses (B &… — cleared for impact study
All 4 Green Power Sugars projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.