Quick answers
What is this project?
Diversion of Forest Land for Laying Optical Fiber Cable With in Row of the Existing Road of Vaduj-Rikibadarwadi is a proposed road project in Kombadwadi, Koregaon, Satara, Maharashtra. The site covers 0.2 acres.
Who is building it?
The applicant is Arcsons Infratech Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Kombadwadi, Koregaon, Satara, Maharashtra.
How big is it?
It has a stated cost of ₹60 lakh; a site of 0.2 acres and 490 m² of forest land.
When was it filed?
The application was filed on 28 Apr 2024.
Project details
| Official title | Proposal for Diversion of Forest Land for Laying Optical Fiber Cable With in Row of the Existing Road of Vaduj-Rikibadarwadi in District Satara |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 17 Feb 2026 |
| Application filed | 28 Apr 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Arcsons Infratech Private Limited |
| Land area | 1,000 m² |
| Forest land | 490 m² |
| Project cost | ₹60 lakh |
| Village / locality | Kombadwadi |
| Taluk / tehsil | Koregaon |
| District | Satara |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16221 |
In context
27 applications in Satara since January 2022 are in the same category (Roads & highways): 1 approved, 22 filed or under review, and 4 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 83% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kombadwadi, Koregaon, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Laying Optical Fiber Cable Within Row of the… — lapsed, 1.7 km away
- Proposed Molasses and Cane Juice Based Distillery/ Grain based Distillery (RS/… — environmental approval granted, 2 km away
- Amendment in the existing EC 10000 TCD, new 60 MW Co-gen & 200 KLPD Molasses… — environmental approval granted, 6.6 km away
- Diversion of Forest Land at Proposed Location No.07 of Construction of 132KV… — lapsed, 7.8 km away
- Proposal of diversion of forest land at proposed Loc.No.07 of construction of… — in-principle approval, conditions pending, 7.9 km away
- Environmental Clearance for Basalt Stone Quarry having area 2.00 Ha of Shri.… — environmental approval granted, 9.7 km away
- Environmental Consent for Additional 50% Increase in Distillery Production… — initial checks, 10 km away
- Environmental Consent for Additional 50 Percent Increase in Distillery… — initial checks, 10 km away
More from Arcsons Infratech Private Limited in Satara
All 7 Arcsons Infratech projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.